Abstract

Purpose: The study helped unearth the influence of contract management practices on performance of state corporations in Kenya.

Methodology: This study employed descriptive research design. The study reviewed both theoretical and empirical literature and then proposed the research methodology that addressed the gaps identified in literature as well as to validate the statistical hypotheses. The study preferred this method because it allows an in-depth study of the subject. The target population was all the 187 state corporations in Kenya. Questionnaires were administered to collect qualitative and quantitative data from a sample of 127 heads of procurement, who were selected using simple random sampling, from the four strata. After data collection, quantitative data was coded using Statistical Package for Social Science (SPSS) version 20.0. Data was analyzed through descriptive statistical methods such as means, standard deviation, frequencies and percentage. Inferential analyses was used in relation to correlation analysis and regression analysis to test the relationship between the four explanatory variables and the explained variable.

Results: The response rate of the study was 82%. The findings of the study indicated that administration strategy, monitoring and evaluation, stakeholder management and conflict management have a positive relationship with performance of state corporations in Kenya.

Conclusion: Based on the study findings, the study concludes that performance of state corporations can be improved by administration strategy, monitoring and evaluation, stakeholder management and conflict management. First, in regard to administration strategy, the regression coefficients of the study show that it has a significant influence on performance of state corporations.

Policy recommendation: the study recommended that public institutions should embrace contract management practices so as to improve performance and further researches should to be carried out in other public institutions to find out if the same results can be obtained.

Downloads

Download data is not yet available.

Author Biographies

MICHAEL MWINZI MWENDWA, JOMO KENYATTA UNIVERSITY OF AGRICULTURE AND TECHNOLOGY

Student

Dr. GEORGE OCHIRI, JOMO KENYATTA UNIVERSITY OF AGRICULTURE AND TECHNOLOGY

Lecturer

References

Abouzeedan, A., & Busler, M. (2012). Information technology (IT) Impact on Performance of Small and Medium-size Enterprises (SMEs) 16th Work Shop. Barcelona, Spain, 2(1), 22-28.

Agaba, E., & Shipman, N. (2010). Public Procurement Reform in Developing Countries: The Ugandan Experience. Boca Raton, FL: Pr Academics Press.

Aitken, J., Childerhouse, P., & Towill, D. (2008). The impact of product life cycle on supply chain strategy. International Journal of Production Economics, 85(2), 127–140.

Akech, J.M. (2008). Development partners and governance of public procurement in Kenya: enhancing democracy in the administration of aid. Int. law Politics, 37(4), 829-868.

Al Awad, M. (2010). “The role of manufacturing in promoting sustainable economic growth in the GCC”, Working paper, Institute for Social & Economic Research (ISER), Zayed University, Knowledge Village, Dubai.

Alsaaty, F.M., & Sawyer, G. (2012). “The competitive advantage of the United States versus China in the Gulf Cooperation Council (GCC) Countries”, Journal of International Business Research, 11(1), 121-131.

Alzahrani, J.I., & Emsley, M.W. (2013). The impact of contractors’ attributes on construction project success: A post construction evaluation. International Journal of Project Management, 31(2), 313-322.

Amayi, F.K. (2011). Factors Affecting Procurement in the Public Service: a Case Study of the State Law Office. Eldoret: Moi University.

Andreasen, P. (2012). The Dynamics of Procurement Management: A Complexity Approach. Frederiksberg: Copenhagen Business School [Phd].

Armstrong, M., & Baron, A. (2014). Managing performance: performance management in action. London: Chartered Institute of Personnel and Development.

Arrow, S. (2008). An overview of EC policy on public procurement: European journal of Operation research, 2(1), 16-24.

Artley, W., & Stroh, S. (2009). The Performance-Based Management Handbook: A Six- Volume Compilation of Techniques and Tools for Implementing the Government Performance and Results Act, 9(3), 2-15.

Awino, B., & Wainaina, G., (2009). “An empirical investigation of supply chain management practices in large private manufacturing firms in Kenya” unpublished PhD thesis. University of Nairobi.

Baldry, D., & Amaratunga, D., (2012). Performance Measurement in Facilities Management and its Relationships with Management Theory and Motivation, Facilities, 20(10), 327-336.

Balogun, M.J. (2008). Performance Management and Agency Governance for Africa Development: The search for common cause on Excellence in the Public Service. UNCEA, Addis Ababa.

Basheka, B.C, & Bisangabasaija, E. (2010). Determinants of unethical public procurement in local government systems of Uganda: a case study. Int. J. Procurement Manage. 3(1), 91-104.

Belz, C., & Wuensche, M. (2009). “Classification of performance contracting solutions: a managerial typology”, paper presented at the 2nd International Conference on Business Market Management.

Bjorkman, M. (2006). Public Funding in the Educational Sector and Its Effect on Test Scores in Essays on Empirical Development Economics: Education, Health and Gender, IIES Monograph Series No 56, Stockholm University.

Cachon, G. (2013). Supply chain coordination with contracts. Handbooks in Operations Research and Management Science: Supply Chain Management. North Holland, Amsterdam, 8(9), 229–339.

Carayannis, E.G., & Popescu, D. (2008). Profiling a Methodology for Economic Growth and Convergence: Learning from the EU e-Procurement Experience for Central and Eastern European Countries, 25(1), 1-14.

Cheung, C.F., Wang, W.M., & Lo, V., (2014). An agent oriented and knowledge based system for strategic e-procurement. Expert Systems, 21(1), 11-19.

Choi, T.Y., & Krause, D. (2008). "The supply base and its complexity: Implications for transaction costs, risks, responsiveness, and innovation". Journal of Operations Management, 2(4), 637-652.

Chris, M., & Adam, D. (2009). "Using SPC to measure a national supermarket chain's suppliers' performance", International Journal of Operations & Production Management, 27(8), 874– 900

Christopher, M., & Peck, H. (2014). "Building the Resilient Supply Chain". International Journal of Logistics Management, 15(2), 1-13.

CIPS (2008). How do we measure up? An Introduction to Performance Measurement of the Procurement Profession. Retrieved September 17, 2017, from Chartered Institute of Purchasing and Supply.

Clemons, E.K., Reddi, S.P., & Row, M.C. (2010). “The Impact of Information Technology on the Organization of Economic Activity: The „Move to the Middle‟ Hypothesis,” Journal of Management Information Systems, 10(2), 9-35.

Cousins, P., & Speckman, R. (2008). Strategic supply and the management of inter- and intra-organizational relationships, Journal of Physical Distribution & Logistics Management, 9(1), 19-29.

Cox, A., (2008). Understanding buyer and supplier power: a framework for procurement and supply competence. The Journal of Supply Chain Management 37(2), 8-15.

Cox, A., Lonsdale, C., Watson, G., & Wu, Y. (2010). Supplier relationship management as an investment: evidence from UK study, Journal of General Management, 30(4), 27-42.

Crawford, P., & Bryce, H. (2013). Project Monitoring and Evaluation: a method for enhancing the efficiency and effectiveness of aid project implementation. International Journal of Project Management, 34(2), 363-383.

Danese, P., Romano, P., & Formentini, M. (2013). The Impact of Supply Chain Integration on Responsiveness: The Moderating Effect of using an International Supplier Network. Transportation Research 49(1), 125–140.

Dean, A.M., & Kiu, C. (2012). “Performance monitoring and quality outcomes in contracted services”, International Journal of Quality & Reliability Management, 19(4), 396-413.

Desouza, K.C. (2008). The neglected dimension in strategic sourcing: security, Strategic outsourcing: An international journal, 1(3), 288-292.

Dorward, A. (2010). “The effects of transaction costs, power and risk on contractual arrangements: a conceptual framework for quantitative analysis”, Journal of Agricultural Economics, 52(2), 59-73.

Dyer, J.H., & Nobeoka, K. (2010). "Creating and managing a high-performance knowledge- sharing network: the Toyota case", Strategic Management Journal, 21(3), 345-367.

Edler, J., & Georghiou, L. (2010). Public procurement and innovation. Resurrecting the demand side. Research Policy, 3(6), 949-963.

Evenett, S.J., & Hoekman, B.M., (2014). International disciplines on government procurement: a review of economic analyses and their implications, Centre for Economic Policy Research, 4(3), 24-38.

Fisher, M.L., & Mcclelland, A.S. (2010). "Rocket Science Retailing is Almost Here: Are You Ready?" Harvard Business Review Journal, 78(4), 115-124.

Gianakis, G. (2012). “The promise of public sector performance measurement: anodyne or placebo?” Public Administration Quarterly, 2(6), 34-64.

Golafshani, N. (2008). Understanding Reliability and Validity in Qualitative Research, The Qualitative Report, 8(4), 597-607.

Greiling, D. (2008). Performance measurement: a remedy for increasing the efficiency of Public services. International Journal of Productivity and Performance Management, 55(6), 448-465.

Handfield, R.B., & Bechtel, C. (2012). The role of trust and relationship structure in improving supply chain responsiveness. Journal of Industrial Marketing Management, 31(4), 367-382.

Harrison, A., & Hoek, R.I. (2011). Logistics management and strategy: competing through the supply chain. [rev.] ed. Harlow: Pearson/Financial Times Prentice Hall.

Heinrich, C.J. (2012). Outcomes-based performance management in the public sector: Implications for government accountability and effectiveness. Public Administration Rev. 62(6), 712–725.

Holweg, M. (2009). "An Investigation into Supplier Responsiveness". International Journal of Logistics Management, 16(1), 96-119.

Hoole, R. (2008). Five ways to simplify your supply chain, Emerald.

Humphreys, P., Li, W., & Chan, L. (2014). The impact of supplier development on buyer-supplier performance, The International Journal of Management Science, 3(2), 131-143.

James, H., & Faizul, H. (2010). From arms-length to collaborative relationships in the supply chain: An Evolutionary process. International Journal of Physical Distribution& Logistics Management, 3(9), 750-764.

Joash, M., & Peterson, M. (2012). Synergies in African business and management practices. International Journal of Physical Distribution & Logistics Management, 27(1), 39-52.

Johnson, R.B., & Onwuegbuzie, A.J. (2008). Mixed Methods Research: A Research Paradigm Whose Time Has Come, Educational Researcher, 33(7), 14-26.

Kakwezi, P., & Nyeko, S., (2010). Procurement Processes and Performance: Efficiency and Effectiveness of the Procurement Function: Makerere University Press, Kampala.

Kannan, V.R., & Tan, K.C. (2009). Buyer-supplier relationships, The impact of supplier selection and buyer-supplier engagement on relationship and firm performance. International Journal of Physical Distribution & Logistics Management, 36(10), 755-786.

Kasomo, D. (2009). Research Methods in Humanities and Education, Eldoret; Zapf Chancery.

Klakegg, O.J., & Williams, T. (2008). “Governance frameworks for public project development and estimation.” Project Management Journal, 3(9), 27-42.

Kombo, D., & Tromp, D. (2010). Proposal and Thesis Writing, an introduction. Nairobi: Pauline Publications Africa.

Kothari, C.R. (2009). Research methodology: Methods and Techniques. 2Ed, New Age International.

Kumar, R., & Markeset, T. (2008). “Development of performance-based service strategies for the oil and gas industry: a case study”, Journal of Business & Industrial Marketing, 2(2), 4-18.

Kusek, J., & Rist, C. (2014). Ten Steps to a Results-based Monitoring and Evaluation System: A Handbook for project managers. World Bank Publications.

Larry, H. (2013). Advanced Statistics in Research: Reading, Understanding, and Writing Up Data Analysis Results. Publisher: Shadow Finch Media LLC.

Lazear, E. P. (2010). Performance pay and productivity. Amer. Econom. Rev. 90(5), 1346–1361.

Liker, J., & Choi, T. (2010). Building deep supplier relationships. Harvard business review on supply chain management.

Malta, V., Schapper, R., Calvo-Gonzale, O., & Berroa, D. (2011). Old Rules, New realities: Are existing public procurement systems addressing current and future needs? Washington, D.C.: The World Bank.

Matanda, M.J. & Ndubisi, N.O. (2009). “Market orientation, supplier perceived value and business performance of SMEs in a Sub-Saharan African nation”, Journal of Enterprise Information Management, 22(4), 384-407.

Ngechu, M. (2009). Understanding the Research Process and Methods. An Introduction to Research Methods. Acts press, Nairobi.

Ngugi, J.K. & Mugo H.W. (2012). Internal factors affecting procurement process of supplies in the public sector; a survey of Kenya government ministries. Paper presented at 5th International Public Procurement Conference. Seattle, USA.

OECD. (2010). Integrity in Public Procurement: Mapping out Good Practices for Integrity and Corruption Resistance in Public Procurement.

Omboi, B.M., & Kariuki, F.K. (2011). Factors Affecting Implementation of Performance Contract Initiative at Municipal Council of Maua-Kenya. Research Journal of Finance and Accounting, 2(2), 9-10.

Ondieki, J. N, & Oteki, E.B., (2015). Effect of supplier relationship management on the effectiveness of supply chain management in the Kenya public sector. International Journal of Managing Value and Supply Chains, 6(1), 100-118.

Oso, Y. & Onen, D. (2009). A general Guide to Writing Research Proposal and Report. Kisumu: Options Printers and Publishers.

Pal, H. & Ireland, W. (2009). Performance Management: Key Strategies and Practical guidelines, 3rd Ed. MPG Books ltd., Bodmin, Cornwall.

Paul, D., Benn, L. & Brian, S. (2008). "Performance measurement in strategic buyer-supplier relationships: The mediating role of socialization mechanisms", International Journal of Operations & Production Management, 28(3), 238–258.

PPOA. (2010). Assessing Procurement Systems in Kenya Report. Nairobi: Public Oversight Authority.

PPRA (2009). Procurement Audit Report for 30 Procuring Entities, retrieved from http://www.ppra.go.tz on 28/09/2012.

Rogers, P.A. (2008). “Optimising supplier management and why co-dependency equals mutual success”, Journal of Facilities Management, 4(1), 40-50.

Rotich, L. M. (2011). Influence of Planning on Procurement Performance in the Kenya Public Financial Sector. International Journal of Operations & Production Management, 20(40), 38–58.

Saeed, K.A., Malhotra, M.K. & Grover, V. (2009). “Examining the impact of inter organizational systems on process efficiency and sourcing leverage in buyer-supplier dyads”, Decision Sciences, 36(3), 365-390.

Said, J., Alam, M. M., & Aziz, M. A. (2015). Public accountability system: Empirical assessment of public sector of Malaysia. Asian Journal of Scientific Research, 8(2), 225-236.

Schuhmann, R., & Eichhorn B. (2015). “From contract Management to contractual Management”. European Review of Contract Law, 11(1), 1-21.

Semich, J. (2010). “The Costs of Quality”,. Purchasing Journal, 30(3), 61-63.

Sriram, V., Krapfel, R. & Spekman, R. (2008). Antecedents to buyer-seller collaboration: an analysis from the buyers' perspective'. Journal of Business Research 25(4), 303-320.

Sylvia, J. H. (2008). The role of technical skill in perceptions of managerial performance. Journal of Management Development. Emerald Group Publishing Limited. 27(3), 12-35

Tukamuhabwa, S. (2012). Antecedents and consequences on public procurement non-compliance Behaviour, Journal of Economics and Behavioural studies, 4(1) 34-46.

Wachiuri, E. W., Waiganjo, E. & Oballa, D. (2015). ‘Role of supplier development on organizational performance of manufacturing industry in Kenya’ International journal of education and research, 3(3), 22-33.

Wang, S., & Bunn, M.D. (2014). Government/Business Relationships: Insights into Contract Implementation. Journal of Public Procurement, 4 (1), 84-115.

Wanyama, J. (2013). The effectiveness of the Procurement Regulations in Kenya. Nairobi: Pr Academics Press.

Weele, V. J., (2010). Purchasing & Supply Chain Management: Analysis, Strategy, Planning and Practice. 4th edition, London, Thomson Learning.

World Bank (2013). “Reducing Supply Chain Barriers Could Increase Global GDP Up To 6 Times More Than Removing All Import Tariffs Report”, Switzerland.

Downloads

Published

2019-03-29

How to Cite

MWENDWA, M. M., & OCHIRI, D. G. (2019). INFLUENCE OF CONTRACT MANAGEMENT PRACTICES ON PERFORMANCE OF STATE CORPORATIONS IN KENYA. International Journal of Supply Chain and Logistics, 3(1), 50–75. https://doi.org/10.47941/ijscl.283

Issue

Section

Articles