Influence of Contract Management on Performance of Public Hospitals in Nairobi City County, Kenya

Authors

  • Anne Wanjiru Karoki Jomo Kenyatta University of Agriculture and Technology
  • Dr. Patrick Mwangangi Jomo Kenyatta University of Agriculture and Technology

DOI:

https://doi.org/10.47941/ijscl.457

Keywords:

Contract planning, monitoring and evaluation, contractor relationship management, dispute resolution, performance, public hospitals

Abstract

Purpose: The study sought to establish the influence of contract management on performance of public hospitals in Nairobi City County, Kenya.

Methodology: This study employed descriptive research design. The study reviewed both theoretical and empirical literature and then proposed the research methodology that addressed the gaps identified in literature as well as to validate the statistical hypotheses. The researcher preferred this method because it allows an in-depth study of the subject. The study population was all public hospitals in Kenya. To gather data, structured questionnaire was used to collect data from 76 staff in procurement, administration and finance departments from the four largest public hospitals in Nairobi County; Kenyatta National Hospital, Mama Lucy Kibaki Hospital, Mbagathi District Hospital and Pumwani Maternity. The target population was all public hospitals in Nairobi City County. The target population was first stratified then using simple random sampling among the four strata, select the samples. The study combined two methods in its data collection that is, questionnaires and key informant interviews. After data collection, quantitative data was coded using Statistical Package for Social Science (SPSS) version 20. Data was analyzed through descriptive statistical methods such as means, standard deviation, frequencies and percentage. Inferential analysis was used in relation to correlation analysis and regression analysis to test the relationship between the four explanatory variables and the explained variable.

Findings: R square value of 0.647 means that 64.7% of the corresponding variation in performance of public hospitals in Kenya can be explained or predicted by (contract planning, monitoring and evaluation, contractor relationship management and dispute resolution) which indicated that the model fitted the study data. The results of regression analysis revealed that there was a significant positive relationship between dependent variable and independent variable at (β = 0.647), p=0.000 <0.05). The findings of the study concluded that contract planning, monitoring and evaluation, contractor relationship management, dispute resolution have a positive relationship with performance of public hospitals in Kenya.

Unique contribution to theory, practice and policy: The study recommended that public institutions should embrace contract management practices so as to improve performance and further researches should to be carried out in other public institutions to find out if the same results can be obtained.

Downloads

Download data is not yet available.

Author Biographies

Anne Wanjiru Karoki, Jomo Kenyatta University of Agriculture and Technology

Post Graduate Student: Department of Procurement and Logistics, Jomo Kenyatta University of Agriculture and Technology

Dr. Patrick Mwangangi, Jomo Kenyatta University of Agriculture and Technology

Lecturer: Department of Procurement and Logistics, Jomo Kenyatta University of Agriculture and Technology

References

Abouzeedan, A., & Busler, M. (2012). Information technology (IT) Impact on Performance of Small and Medium-size Enterprises (SMEs) 16th Work Shop. Barcelona, Spain, 2(1), 22-28.

Aitken, J., Childerhouse, P., & Towill, D. (2008). The impact of product life cycle on supply chain strategy. International Journal of Production Economics, 85(2), 127-140.

Belz, C., & Wuensche, M. (2009). "Classification of performance contracting solutions: a managerial typology", paper presented at the 2nd International Conference on Business Market Management.

Bjorkman, M. (2006). Public Funding in the Educational Sector and Its Influence on Test Scores in Essays on Empirical Development Economics: Education, Health and Gender, IIES Monograph Series No 56, Stockholm University.

Cheung, C.F., Wang, W.M., & Lo, V., (2014). An agent oriented and knowledge-based system for strategic e-procurement. Expert Systems, 21(1), 11-19.

Choi, T.Y., & Krause,D. (2008). "The supply base and its complexity: Implications for transaction costs, risks, responsiveness, and innovation". Journal of Operations Management, 2(4), 637-652.

Chris, M., & Adam, D. (2009). "Using SPC to measure a national supermarket chain's suppliers' performance", International Journal of Operations & Production Management, 27(8), 874- 900

Christopher, M., & Peck, H. (2014). "Building the Resilient Supply Chain". International Journal of Logistics Management, 15(2), 1-13.

CIPS (2008). How do we measure up? An Introduction to Performance Measurement of the Procurement Profession. Retrieved September 17, 2017, from Chartered Institute of Purchasing and Supply.

Cox, A., (2008). Understanding buyer and supplier power: a framework for procurement and supply competence. The Journal of Supply Chain Management 37(2), 8-15.

Cox, A., Lonsdale, C., Watson, G., & Wu, Y. (2010). Supplier relationship management as an investment: evidence from UK study, Journal of General Management, 30(4), 27-42.

Danese, P., Romano, P., & Formentini, M. (2013). The Impact of Supply Chain Integration on Responsiveness: The Moderating Influence of using an International Supplier Network. Transportation Research 49(1), 125-140.

Dean, A.M., & Kiu, C. (2012). "Performance monitoring and quality outcomes in contracted services", International Journal of Quality & Reliability Management, 19(4), 396-413.

Desouza, K.C. (2008). The neglected dimension in strategic sourcing: security, Strategic outsourcing: An international journal, 1(3), 288-292.

Dorward, A. (2010). "The influences of transaction costs, power and risk on contractual arrangements: a conceptual framework for quantitative analysis", Journal of Agricultural Economics, 52(2), 59-73.

Dyer, J.H., & Nobeoka, K. (2010). "Creating and managing a high-performance knowledge- sharing network: the Toyota case", Strategic Management Journal, 21(3), 345-367.

Edler, J., & Georghiou, L. (2010). Public procurement and innovation. Resurrecting the demand side. Research Policy, 3(6), 949-963.

Evenett, S.J., & Hoekman, B.M., (2014). International disciplines on government procurement: a review of economic analyses and their implications, Centre for Economic Policy Research, 4(3), 24-38.

Fisher, M.L., & Mcclelland, A.S. (2010). "Rocket Science Retailing is Almost Here: Are You Ready?" Harvard Business Review Journal,78(4), 115-124.

Gianakis, G. (2012). "The promise of public sector performance measurement: anodyne or placebo?" Public Administration Quarterly, 2(6), 34-64.

Golafshani, N. (2008). Understanding Reliability and Validity in Qualitative Research, The Qualitative Report, 8(4), 597-607.

Greiling, D. (2008). Performance measurement: a remedy for increasing the efficiency of Public services. International Journal of Productivity and Performance Management,55(6), 448-465.

Handfield, R.B., & Bechtel, C. (2012). The role of trust and relationship structure in improving supply chain responsiveness. Journal of Industrial Marketing Management, 31(4), 367-382.

Harrison, A., & Hoek, R.I. (2011). Logistics management and strategy: competing through the supply chain. [rev.] ed. Harlow: Pearson/Financial Times Prentice Hall.

Heinrich, C.J. (2012). Outcomes-based performance management in the public sector: Implications for government accountability and effectiveness. Public Administration Rev. 62(6), 712-725.

Holweg, M. (2009). "An Investigation into Supplier Responsiveness". International Journal of Logistics Management, 16(1), 96-119.

Hoole, R. (2008). Five ways to simplify your supply chain, Emerald.

Humphreys, P., Li, W., & Chan, L. (2014). The impact of supplier development on buyer-supplier performance, The International Journal of Management Science, 3(2), 131-143.

James, H., & Faizul, H. (2010). From arms-length to collaborative relationships in the supply chain: An Evolutionary process. International Journal of Physical Distribution& Logistics Management,3(9), 750-764.

Joash, M., & Peterson, M. (2012). Synergies in African business and management practices. International Journal of Physical Distribution & Logistics Management, 27(1), 39-52.

Johnson, R.B., & Onwuegbuzie, A.J. (2008). Mixed Methods Research: A Research Paradigm Whose Time Has Come, Educational Researcher, 33(7), 14-26.

Kakwezi, P., & Nyeko, S., (2010). Procurement Processes and Performance: Efficiency and Effectiveness of the Procurement Function: Makerere University Press, Kampala.

Kannan, V.R., & Tan, K.C. (2009). Buyer-supplier relationships, The impact of supplier selection and buyer-supplier engagement on relationship and firm performance. International Journal of Physical Distribution & Logistics Management, 36(10), 755-786.

Kasomo, D. (2009). Research Methods in Humanities and Education, Eldoret; Zapf Chancery.

Kazakhstann, J.R. & Jakob, S. (2010). Survey Tools for Assessing Performance in Service Delivery. In the Impact of Economic Policies on Poverty and Income Distribution: Evaluation Techniques and Tools, edited by François.

Klakegg, O.J., & Williams, T. (2008). "Governance frameworks for public procurement processes development and estimation." Procurement processes Management Journal, 3(9), 27-42.

Kombo, D., & Tromp, D. (2010). Project and Thesis Writing, an introduction. Nairobi: Pauline Publications Africa.

Kothari, C.R. (2009). Research methodology: Methods and Techniques. 2Ed, New Age International.

Kumar, R., & Markeset, T. (2008). "Development of performance-based service strategies for the oil and gas industry: a case study", Journal of Business & Industrial Marketing, 2(2), 4-18.

Kusek, J., & Rist, C. (2014). Ten Steps to a Results-based Monitoring and Evaluation System: A Handbook for procurement processes managers. World Bank Publications.

Larry, H. (2013). Advanced Statistics in Research: Reading, Understanding, and Writing Up Data Analysis Results. Publisher: Shadow Finch Media LLC.

Lazear, E. P. (2010). Performance pay and productivity. Amer. Econom. Rev. 90(5), 1346-1361.

Liker, J., & Choi, T. (2010). Building deep supplier relationships. Harvard business review on supply chain management.

Matanda, M.J. & Ndubisi, N.O. (2009). "Market orientation, supplier perceived value and business performance of SMEs in a Sub-Saharan African nation", Journal of Enterprise Information Management, 22(4), 384-407.

Mohan, G. (2010). Participatory Development. In Desai, Vandana and Potter, Rob eds. The Arnold Companion to development studies. London, UK.

Ngechu, M. (2009). Understanding the Research Process and Methods. An Introduction to Research Methods. Acts press, Nairobi.

Ngugi, J.K. & Mugo H.W. (2012). Internal factors affecting procurement process of supplies in the public sector; a survey of Kenya government ministries. Paper presented at 5th International Public Procurement Conference. Seattle, USA.

OECD. (2010). Integrity in Public Procurement: Mapping out Good Practices for Integrity and Corruption Resistance in Public Procurement.

Omboi, B.M., & Kariuki, F.K. (2011). Factors Affecting Implementation of Performance Contract Initiative at Municipal Council of Maua-Kenya. Research Journal of Finance and Accounting, 2(2), 9-10.

Ondieki, J. N, & Oteki, E.B., (2015). Influence of supplier relationship management on the effectiveness of supply chain management in the Kenya public sector. International Journal of Managing Value and Supply Chains, 6(1), 100-118.

Oso, Y. & Onen, D. (2009). A general Guide to Writing Research Project and Report. Kisumu: Options Printers and Publishers.

Paul, D., Benn, L. & Brian, S. (2008). "Performance measurement in strategic buyer-supplier relationships: The mediating role of socialization mechanisms", International Journal of Operations & Production Management, 28(3), 238-258.

PPOA. (2010). Assessing Procurement Systems in Kenya Report. Nairobi: Public Oversight Authority.

PPRA (2015). Procurement Audit Report for 30 Procuring Entities, retrieved from http://www.ppra.go.tz on 28/09/2012.

Downloads

Published

2020-10-14

How to Cite

Karoki, A. W., & Mwangangi, D. P. (2020). Influence of Contract Management on Performance of Public Hospitals in Nairobi City County, Kenya. International Journal of Supply Chain and Logistics, 4(1), 46–69. https://doi.org/10.47941/ijscl.457