Project Team Planning and Performance of Housing Projects in Kenya

Authors

  • Charles Muiruri Wanjau Jomo Kenyatta University of Agriculture and Technology
  • Prof. Gregory Simiyu Namusonge Jomo Kenyatta University of Agriculture and Technology
  • Dr. Benard Lango Jomo Kenyatta University of Agriculture and Technology

DOI:

https://doi.org/10.47941/jepm.1653

Keywords:

Housing, Projects, Team Planning, Performance

Abstract

Purpose: The purpose of this study was to examine the influence of project team planning on the performance of housing projects in Kenya.

Methodology: The study applied mixed methods research design. The study target population was 675 strategic registered contractors in the housing projects in Nairobi metropolitan, Kenya.  Based on Yamane Formula adopted the sample size for this study was 251 respondents. Purposive sampling was used to select the 251 from the list of 675 contractors.  The respondents consisted of the project managers; engineers; architects; contractors; and the site supervisors. The study used both primary and secondary data using semi structured questionnaires and interview guides. The study used SPSS version 25 software to analyze the data where both descriptive and inferential analyses were obtained.

Results: The inferential analysis results revealed that project team planning had a significant and positive influence on the performance of housing projects in Kenya at p<0.05. This indicates that project team skills, project team experience, communication plan and project team efficacy are vital in the performance of housing projects.  The study used analysis of variance to determine whether the model is significant and shows the good fit for the data. The Coefficient of determination R2 of 0.513 showed that 51.3% of housing project performance is explained by project team planning.

Unique contribution to theory, practice and policy: While the existing competency theory used in this study was validated, the study recommends that contractors in Kenya should consider project team planning as an important aspect in housing projects as has been observed by majority of the contractors. The study recommends the government to make appropriate policies in housing implementation in the ministry of housing which promote the establishment of comprehensive project teams that include experts in various domains such as architecture, engineering, finance, and project management.

Downloads

Download data is not yet available.

Author Biographies

Charles Muiruri Wanjau, Jomo Kenyatta University of Agriculture and Technology

Ph.D. Candidate, School of Business and Entrepreneurship

Prof. Gregory Simiyu Namusonge, Jomo Kenyatta University of Agriculture and Technology

Lecturer, School of Business and Entrepreneurship

Dr. Benard Lango, Jomo Kenyatta University of Agriculture and Technology

Lecturer, School of Business and Entrepreneurship

References

Achar, M., Chebii, P., & Nugo, J. (2021). The Role of Communication Channels on Implementation of Housing Construction Projects in Nairobi County, Kenya. African Journal of Education, Science and Technology, 6(3).

Akinyende, I., Fapohunda, J., & Haldenwang, R. (2020). The Factors that Influence Human Resources on Affordable Housing Delivery Within Resytain of Budget. Multidisciplinary Scientific Journal, 3(3), 250-256.

Andy, B. (2018, January 20). Building Collaborative client Relationships with the Entire Team. Retrieved from Building & Construction: http//attendesigngroup.com/blog/team-client-collaboration.

Barmasai, J., & Mbugua, D. J. (2020). ). Factors Influencing Implementation of Projects in State Corporations in Kenya: A Case of Kenya Pipeline Company Limited. Journal of Entrepreneurship & Project Management, 4(2), 47-67.

Crawford, L., & Nahmias, A. H. (2010). Competencies for managing change. International journal of. International journal of Project Management, 28(4), 405-412.

Czainska, K. (2020). Competencies of Managers of Deep Organizational Changes. European Research Studies Journal, 466-485.

Gardner, David; Lockwood, Keith :Piennar, Jacus; Maina, Miriam. (2019). Assessing Kenya's Affordable Affordable Housing. JohannesburG: CENTRE FOR AFFORDABLE HOUSING FINANCE IN AFRICA.

Gicovi, N. N. (2018). Influence Of Team Management Practices On Performance Of Community-Based Value-Addition Projects In Embu County, Kenya. Doctoral Dissertation. Maua.

Giti, D. M., K'Akumu, O. A., & Ondieki, E. O. (2020). Enhanced role of private sector through public private partnerships in low income urban housing in Kenya. Journal of Financial Management of Property and Construction.

GOK. (2018). Sector Plan for Population, Urbanization and Housing; Miedium Term Plan III, 2018-2022. Nairobi: Government Press.

Kanyago, G. M. (2017). Role of Project Management Skills on Performance of Construction Firms in Kigali Rwanda. European Journal of Business and Social Sciences, 6(7), 12-23.

Kieti,R, M. (2020). Affordable Housing in Kenya. AFRICA HABITAT REVIEW. AFRICA HABITAT REVIEW, 4(1), 1677.

Kinuthia, K. K., & Muchelule, D. Y. (2021). Influence of Internal Management Competencies on Performance of Commercial Housing Projects in Kiambu County,. Journal of Entrepreneurship and Project Management, 6(1), 1-23.

Makau, R. M., & Moronge, M. (2018). Determinants of Project Team Performance in Building Construction Projects in Nairobi County, Kenya. Doctoral Dissertation. Jomo Kenyatta University og Agriculture and Technology.

Makokha, E. (2020). Influence of Project Planning Practices on Performance of Projects in Kenya. International Journal of Social Sciences and Information Technnology, V(V).

Manyara, E. M. (2020). The Influence of Project Planning, Stakeholder Engagement and Project Monitoring and Control On the Delivery of Projects at Kenya Airports Authority. United States International University-Africa.

Matu, J., Kyalo, D. N., Mbugua, J., & Mulwa, A. S. (2020). Stakeholder participation in project initiation: a foundation to completion of Urban road transport infrastructure projects, Kenya. Journal of Civil, Construction and Environmental Engineering, 5(1), 11.

McClelland, D. C. (1993). Competence at work: Models for superior performance. New York: Wiley.

Momanyi, M., & Sang, P. (2019). Project constraints influencing the construction of residential housing projects in urban centers in Kenya: A study of National Housing Corporation. International Academic Journal of Information Sciences and Project Management, 3(5), 165-183.

Momanyi, T. N., & Kamau, L. N. (2020). Influence of Contractors Management Practices on Performance of Housing Construction Projects in Kisii County, Kenya.

Murinzi, J., Mulyungi, & Muchelule, Y. (2018). Effect of project team skills on performance of. International Journal of Management and Commerce Innovation, 6(1), 1347-1354.

Musau, J. K. (2020). Project management practices Influence levels on successful Implementation of borehole water projects in Makueni County, Kenya. Doctoral Dissertation. Jomo Kenyatta University of Agriculture and technology.

Muute, N. (2019). Project Planning Practices and Performance of Construction Projects in Nairobi City County. Doctoral Dissertation. Kenyatta University.

Mwangi, I. G., & Kisimbi, J. M. (2020). Critical Success Factors Influencing the Performance of Infrastructure Projects in The Aviation Industry in Kenya; A Case of Moi International Airport. 5(2), 93-113.

Mwangi, K. J. (2018). Factors Influencing Performance of County Government Projects: A Case . Doctoral dissertation. Jomo Kenyattat university of Agriculture and Tehnology.

Mwanza, P., Namusonge, G. S., & Makokha, E. N. (2020). Influence of Project Planning of Construction Projects in Kenya. International Journal of Social Sciences and Informaton Technology .

Mwinzi, A. M., & Moronge, M. (2018). Determinants of completion of housing projects in Informal settlements in Nairobi City County, Kenya. . Strategic Journal of Business & Change Management,, 5(2), 1493-1519.

Ngala, G. K. (2019). Effect of scope changes on project completion among road construction Projects in Nairobi County: a case of Lang'ata Sub County . Doctoral dissertation. Africa Nazarene University.

Njau, D., & Ogolla, P. (2017). Factors influencing Project scope performance; A case of Kenya National Youth Service Projects in Kenya. Strategic Journal of Business and Change Management,, 4(2), 207-220.

Njeri, D. N., & Were, S. (2019). Determinants of project performance in non-govermental organizations in kenya, a case study of hand in hand EASTERN AFRICA. International Journal of Business Management and Finance, 1(1).

Njogu, C., Namusonge, G., & Oluoch, O. (2018). Influence of Project Planning on the Performance of Community Based HIV Projects in Kiambu, Kenya. Journal of Developing Country Schedules, 3(1), 77-95.

Njoroge, J. L. (2018). A framework for Enterprise Resource Planning implementation based on Key success factors in Kenya: A case of Kenya insurance sector organizations (. Doctoral dissertation. KEMU.

Okoronkwo, I. (2017). Team performance and project success.

Omondi, E. F. (2017). Influence of Triple Constraint Management on Completion of Non-Governmental Organizations Water Sanitation and Hygiene (Wash) Projects in Nakuru County, Kenya. University of Nairobi.

Ong'aro, W., & Asumptah, D. (2017). Determinants of Succesful Implimentation of Housing Projects in Rwanda: A Case of Roko Construction Company. International Journal of Entrepreneurship and Project Management,, 2(2), 69 - 85.

PMI. (2017). A Guide to the project Management Body of Knowledge(PMBOK) 6th ed. Newtown Square : PA.

PMI. (2019). A Guide to the Project Management Body of Knowledge (PMBOK(R) Guide-Sixth Edition / Agile Practice Guide Bundle. Project Management Institute.

Songa, M. N. (2020). Influence of Organizational Resources on Project Performance of Kenya Power Slum Electrification Project In Nairobi, Kenya. Doctoral Dissertation. Daystar University, School of Business and Economics.

Szwarc, E., & Wikarek, J. (2020). Proactive Planning of Project Team Members'Competences. Foundations of Management, 12(1), 71-84.

Tuyishime, A. C., & Nyambane, D. (2021). Planning and project performance in public institutions in Rwanda. A case of establishment of a Frequency Spectrum Management and monitoring system project in Rwanda. The Strategic Journal of Business & Change Management, 8(1), 780 - 790.

Waweru, Z. W. (2018). Influence of teamwork approach on project performance: a case of road construction in Kericho County, Kenya. Doctoral Dissertation. University of Nairobi.

Downloads

Published

2024-01-31

How to Cite

Wanjau, C. M., Namusonge, G. S., & Lango, B. (2024). Project Team Planning and Performance of Housing Projects in Kenya. Journal of Entrepreneurship and Project Management, 9(1), 12–28. https://doi.org/10.47941/jepm.1653

Issue

Section

Articles