DETERMINANTS OF SUCCESSFUL IMPLEMENTATION OF INTEGRATED TAX PROJECTS OF KENYA REVENUE AUTHORITY, KENYA

Authors

  • Lucas Otieno Migot Jomo Kenyatta University of Agriculture and Technology
  • Dr. Samson Nyanga’u Paul Jomo Kenyatta University of Agriculture and Technology

DOI:

https://doi.org/10.47941/jepm.284

Keywords:

Project Planning, Resource Management, Project Control, Stakeholder Participation, and Successful Implementation of Integrated Tax Projects.

Abstract

Purpose: The current study sought to establish the determinants of successful implementation of integrated tax projects of Kenya Revenue Authority, Kenya.

Methodology: A descriptive design was adopted. The target population was 353 project managers, assistant project managers and supervisors of the four integrated tax projects at Kenya Revenue Authority. A sample size of 187 was determined through Yamane formula and stratified. Data analysis was quantitatively analyzed using the statistical package for social scientists (SPSS V20) for both descriptive and inferential statistics.

Results: The study findings showed that stakeholder participation, project control, project planning and resource management positively influence implementation of the integrated tax projects significantly.

Recommendations: Based on the findings, the study recommends the need for KRA to improve project-planning practices, improve resource management practices. This can be done by having adequate financial resources for each project, availability of adequate material to support project activities, having sound technical expertise for every project having knowledgeable personnel who understands the technical requirements of the project and using relevant technology for each project. The study also recommends a need for KRA to improve its project control practices. This can be done by incorporating policy, procedures and standards of implementation, having quality assurance policies and standards, having quality auditing, and specifications, using control charts and analysis and applying budget and budgetary controls when managing projects. Lastly, the study recommends a need for KRA to improve its stakeholder participation practices. This can be realized through increasing the stakeholder’s participation in the design of the project plan, identification of the scope and benefits of the project, implementation of the project and project monitoring and evaluation.

Downloads

Download data is not yet available.

Author Biographies

Lucas Otieno Migot, Jomo Kenyatta University of Agriculture and Technology

Student

Dr. Samson Nyanga’u Paul, Jomo Kenyatta University of Agriculture and Technology

Lecturer

References

Abiola, J., & Asiweh, M. (2012). Impact of tax administration on government revenue in a developing economy-a case study of Nigeria. International Journal of Business and Social Science, 3(8),45-56

Almarri, K., & Gardiner, P. (2014). Application of resource-based view to project management research: supporters and opponents. Procedia-Social and Behavioral Sciences, 119(7), 437-445.

Amade, B., Ogbonna, A. C., & Kaduru, C. C. (2010). Determinants of successful project management in Nigeria. International Journal of Management Sciences and business Research, 1(6), 90-95

Bourne, L. (2016). Stakeholder relationship management: a maturity model for organisational implementation. Routledge.

Brown, K. A., & Hyer, N. L. (2010). Managing projects: a team-based approach. McGraw-Hill.

Drazkiewicz, A., Challies, E., & Newig, J. (2015). Public participation and local environmental planning: Testing factors influencing decision quality and implementation in four case studies from Germany. Land Use Policy, 46(5), 211-222.

Dvir, D., Raz, T., & Shenhar, A. J. (2003). An empirical analysis of the relationship between project planning and project success. International journal of project management, 21(2), 89-95.

Githenya, M. S., & Ngugi, K. (2014). Assessment of the determinants of implementation of housing projects in Kenya. European journal of business management, 1(11), 230-253.

Harris, J., Croot, L., Thompson, J., & Springett, J. (2016). How stakeholder participation can contribute to systematic reviews of complex interventions. J Epidemiol Community Health, 70(2), 207-214.

Harrison, J. S., & Wicks, A. C. (2013). Stakeholder theory, value, and firm performance. Business ethics quarterly, 23(1), 97-124.

Heagney, J. (2016). Fundamentals of project management. Amacom.

Hodgkin J. (2013). The core competence of the corporation. Harvard Business Review May-June, pp. 79-91.

Holguín-Veras, J., & Preziosi, M. (2011). Behavioral investigation on the factors that determine adoption of an electronic toll collection system: Passenger car users. Transportation Research Part C: Emerging Technologies, 19(3), 498-509.

John, M. P., Mbabazize, M., & Euginia, N. (2017). Role of project resource availability on project success in banking industry in Rwanda: A case of KCB ATM MIS project. European Journal of Business and Social Sciences, 6(2), 90-98.

Kenya Institute for Public Policy Research and Analysis (KIPPRA). (2015). Kenya’s Economic report 2014.

Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.

Kipkemoi, C. W. (2015). iTax System and Service Delivery by Kenya revenue Authority, Nairobi Stations. Unpublished master’s thesis, University of Nairobi, Nairobi, Kenya.

Kondo, E. M. (2015). The effect of revenue enhancement strategies on financial performance of Kenya revenue authority. Unpublished MSc project, University of Nairobi, Kenya.

Luk, S. C. Y. (2009). The impact of leadership and stakeholders on the success/failure of e-government service: Using the case study of e-stamping service in Hong Kong. Government Information Quarterly, 26(4), 594-604.

Martin, N., Furumo, K., & Pearson, J. (2004). Project management in IS: Fit matters. AMCIS 2004 Proceedings, 111.

Mugenda, O. M., & Mugenda, A. G. (2008). Research methodology. Qualitative and Quantitative Methods.

Muriithi, M. K., & Moyi, E. D. (2003). Tax reforms and revenue mobilization in Kenya.

Musyoka, B. S. (2012). Project risk management practices and success of capital projects in Kenya (Doctoral dissertation, School of Business, University of Nairobi).

Mwanajuma, M. B., & Ngugi, K. (2014). Determinants of Completion of Water Projects In Kenya A Case of Ministry of Water And Irrigation. International Journal of Social Sciences and Entrepreneurship, 3(1), 165-187.

Mwangi, G. (2013). Rural poverty, decentralization and development. Business school: Nanjing Normal University

Ocharo, R. N., & Kimutai, G. (2018). Project management practices and implementation of power projects in Kenya. International Academic Journal of Information Sciences and Project Management, 3(1), 28-46.

Oeta, A. N., Ooko, J., & Omoro, D. N. (2017). Itax and revenue collection by Kenya Revenue Authority in western region, Kenya.

Ojha, A. Sahu, G.P. & Gupta, M.P. (2011) "Antecedents of paperless income tax filing by young professionals in India: an exploratory study", Transforming Government: People, Process and Policy, 3(1), 65 – 90

Omolo, E. J. (2015). Factors influencing implementation of project management in public-funded projects in Kenya–the case of Kenya pipeline company, Nairobi County.

Pastukhov, O. (2014). Ukraine: Electronic filing of tax returns. Digital Evidence and Electronic Signature Law Review, 7(0) 323-338.

Republic of Kenya (2016). iTax case study, Government Printers

Steinmo, S. (2003). The evolution of policy ideas: tax policy in the 20th century. The British Journal of Politics and International Relations, 5(2), 206-236.

Sutrisna, M. (2009). Research methodology in doctoral research: understanding the meaning of conducting qualitative research. In Proceedings of the Association of Researchers in Construction Management (ARCOM) Doctoral Workshop held in Liverpool John Moores University. Conducted by ARCOM Liverpool, UK: ARCOM.

Tan, C. W., Pan, S. L., & Lim, E. T. (2005). Managing stakeholder interests in e-government implementation: Lessons learned from a Singapore e-government project. Journal of Global Information Management (JGIM), 13(1), 31-53.

Venkatesh, V., Morris, M. G., Davis, G. B., & Davis, F. D. (2003). User acceptance of information technology: Toward a unified view. MIS quarterly, 425-478.

Warner, J. (2016). The beauty of the beast: Multi-stakeholder participation for integrated catchment management. In Multi-stakeholder platforms for integrated water management (pp. 17-36). Routledge.

WHO. (2015). Millennium Development Goals (MDGs). [online]. Available at http://www.who.int/topics/millennium_development_goals.

Wreh, D. N. (2013). Increasing Tax Payers Compliance in Filing Annual Income Tax Returns in Liberia. SSRN Electronic Journal of Taxation, 7(6),23-34

Wyplosz, C. (2005). Fiscal policy: institutions versus rules. National Institute Economic Review, 191(1), 64-78.

Yamane, T. (1967). Elementary sampling theory. Journal of elementary Research, 6(7),23-45