DETERMINANTS OF PROJECT IMPLEMENTATION ON PERFORMANCE OF REAL ESTATE PROJECTS FINANCED BY REGISTERED SACCOS IN NAIROBI CITY COUNTY, KENYA.

Authors

  • Hamida Wambui Masasabi Jomo Kenyatta University of Agriculture and Technology
  • Dr. Christine Ngari Jomo Kenyatta University of Agriculture and Technology

DOI:

https://doi.org/10.47941/jepm.292

Keywords:

Project Implementation, Project Planning, Project Communication Management, Stakeholder Involvement, Resource Availability, Performance of Real Estate Projects.

Abstract

Purpose: The performance of projects in the Kenyan land development industry has of late been tempestuous. The study was particularly centered on the impact of task planning, venture correspondence, asset accessibility and partner's association on usage of land ventures actualized by SACCOS. The investigation was guided by the following specific objectives: to analyze the influence of project planning on performance of real estate projects financed by registered SACCOS in Nairobi City County; to establish the influence of project communication management on performance of real estate projects financed by registered SACCOS in Nairobi City County; to assess the influence of stakeholder involvement on performance of real estate projects financed by registered SACCOS in Nairobi City County; and to assess the influence of resource availability on performance of real estate projects financed by registered SACCOS in Nairobi City County.

Methodology: The study utilized descriptive examination outline. The target population of this study comprised of all the 153 land development ventures being actualized by the 38 SACCOS enrolled by SASRA in Nairobi County. The examination used census on all the land ventures. Statistical Package for Social Sciences computer programming was utilized for examination. Both descriptive and inferential investigation was directed.

Results: An excellent response rate of 94.7% was realized. It was established that most of the project implementation indicators have positive impact on performance of the real estate projects. The study further adopted a regression analysis to determine the relationship between the variables. The study findings showed that the four variables had a significant influence on performance of the real estate projects.

Contribution to policy and practice: The study recommended that a similar research should be conducted with an aim at investigating the determinates of project implementation on the performance of real estate projects financed by registered SACCOS in Nairobi with other variables or of other firms in other sectors, including the other counties in the Kenya. The findings showed that 69.4 % of the performance is explained by the four variables while 30.6 can be accounted by other factors captured by the standard error.

 

Downloads

Download data is not yet available.

Author Biographies

Hamida Wambui Masasabi, Jomo Kenyatta University of Agriculture and Technology

Post graduate student

Dr. Christine Ngari, Jomo Kenyatta University of Agriculture and Technology

Lecture, University of Eldoret.

References

Anunda, J. S. (2016). Factors influencing the performance of projects implemented by NGOS in the health sector: a case of HIV/AIDS projects in Nairobi County, Kenya.

Binder, J. (2016). Global project management: communication, collaboration and management across borders. Routledge.

Brinkmann, S. (2014).Interview.In Encyclopedia of critical psychology (pp. 1008-1010).Springer New York.

Carnes, C. M., Hitt, M. A., &Xu, K. (2015). A current view of resource based theory in operations management: A response to Bromiley and Rau.

Dang, G., &Pheng, L. S. (2015).Research methodology.In Infrastructure Investments in Developing Economies (pp. 135-155).Springer, Singapore.

Davis, K. (2014). Different stakeholder groups and their perceptions of project success. International journal of project management, 32(2), 189-201.

Flick, U. (2015). Introducing research methodology: A beginner's guide to doing a research project.Sage.

Glesne, C. (2015). Becoming qualitative researchers: An introduction. Pearson.

Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.Routledge.

Heeks, R., &Stanforth, C. (2014). Understanding development project implementation: An actor‐network perspective. Public Administration and Development, 34(1), 14-31.

Heravi, A., Coffey, V., &Trigunarsyah, B. (2015).Evaluating the level of stakeholder involvement during the project planning processes of building projects. International Journal of Project Management, 33(5), 985-997.

Hitt, M. A., Carnes, C. M., &Xu, K. (2016). A current view of resource based theory in operations management: A response to Bromiley and Rau. Journal of Operations Management, 41(10), 107-109.

Humphries, B. (2017). Re-thinking social research: anti-discriminatory approaches in research methodology. Routledge.

Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. John Wiley & Sons.

Kerzner, Harold, and Harold R. Kerzner.(2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons, 2017.

Ledford, J. R., &Gast, D. L. (2018). Single case research methodology: Applications in special education and behavioral sciences. Routledge.

Lewis, S. (2015). Qualitative inquiry and research design: Choosing among five approaches. Health promotion practice, 16(4), 473-475.

Mackey, A., &Gass, S. M. (2015). Second language research: Methodology and design. Routledge.

Meade, A. W., & Craig, S. B. (2012).Identifying careless responses in survey data. Psychological methods, 17(3), 437.

Mera, K., & Renaud, B. (2016). Asia's financial crisis and the role of real estate.Routledge.

Mitchell, V. L., & Zmud, R. W. (2015).The Moderating Effects of Coordinated Planning on Project Performance. Planning for Information Systems, 369.

Nicholas, J. M., &Steyn, H. (2017). Project management for engineering, business and technology.Routledge.

Olaniran, H. F. (2015). On the role of communication in construction projects in Nigeria. Journal of Environmental Science and Technology, 2(5), 048-054.

Ouma M. A. (2016). Factors determining project implementation of health projects in GedoRegion, Somalia. Unpublished Masters Project, University of Nairobi

Panneerselvam, R. (2014). Research methodology. PHI Learning Pvt. Ltd..

Putri, D. A. P. (2012). Effect of Communication Strategy and Planning Intervention on the Processes and Performance of Course Material Development Teams.

Reid, K. (2018). Economic outlook.

Richard, M. K. (2013) Factors influencing the implementation of CDF funded projects in Bureti constituency, Kenya.

Silverman, D. (Ed.). (2016). Qualitative research.Sage.

Smith, J. A. (Ed.). (2015). Qualitative psychology: A practical guide to research methods. Sage.

Sowden, R. (2016). A Practical Guide to Project Planning: A Step-by-step Approach. Stationery Office Limited.

Taylor, S. J., Bogdan, R., &DeVault, M. (2015). Introduction to qualitative research methods: A guidebook and resource. John Wiley & Sons.

Tonchia, S. (2018).Project Communication.In Industrial Project Management (pp. 143-152).Springer, Berlin, Heidelberg.