Contract Management and Performance of Roads Construction Projects in Kenya Urban Roads Authority
DOI:
https://doi.org/10.47941/ijscl.3188Keywords:
Contract Management, Project performance, Legal ComplianceAbstract
Purpose: The study sought to establish the influence of contract management on performance of roads construction projects in Kenya Urban Roads Authority. It was anchored in the institutional theory.
Methodology: The study adopted descriptive research design. The target population involved the Kenya Urban Roads Authority in the Upper Eastern Region. The total population for the study was 145 staffs. Using Slovin’s formulae and stratified random sampling, the study sample size was determined to be 106 respondents. The study used structured questionnaires to gather primary data. A 10% of the study sample population was used for pilot testing in Kenya urban roads, central region. In the data processing and analysis, the quantitative data collected was analyzed using SPSS version 26 where descriptive statistics, including means, and standard deviations was analyzed. Inferential analysis focusing on correlation analysis and regression analysis was also done. The results were summarized using tables and figures.
Findings: The findings indicated that contract management practices had a strong influence on project performance. These findings suggest that improvements in contract management, particularly in feedback mechanisms, compliance, relationship building, and risk management, can significantly enhance the success of road construction projects managed by the Kenya Urban Roads Authority.
Unique Contribution to Theory, Practice and Policy: The study demonstrates that contract management measured by contractor collaboration, legal compliance, and risk management together drive better contract performance in road construction projects. It integrates relational, institutional, and risk frameworks to extend contract-management aspects in devolved infrastructure settings. Practically, it offers actionable measures to reduce delays, cost overruns and defects. Lastly, it supports reforms on contract clauses, enforcement, and payment/retention rules to boost accountability and value-for-money.
Downloads
References
Aggarwal, R., & Ranganathan, P. (2019). Study designs: Part 2 Descriptive studies. Perspectives in Clinical Research, 10(1), 34–36.
Akal, A. (2018). Determinants of Performance in Road Construction Projects in Kenya. Nairobi: JKUAT Press.
Akali, T., & Sakaja, Y. (2018). Influence of contractors’ financial capacity on performance of road construction in Kakamega county. American Scientific Research Journal for Engineering, Technology, and Sciences), 46(1), 34-50.
Akintoye, A., & MacLeod, M. J. (2017). Risk analysis and management in construction. International Journal of Project Management, 15(1), 31–38.
Alu, A. J., Akinola, A. O., & Oladokun, M. G. (2024). Impact of project cost control on the financial performance of the Nigerian construction industry: A qualitative approach. Open Journal of Business and Management, 12(4), 1954–1973.
Cairney, P., & St Denny, E. (2025). Understanding the role of conceptual frameworks: how they shape research design, analysis, and interpretation. International Journal of Social Research Methodology, 28(2), 150–163.
Chepkemoi, J. (2020). Influence of project management skills on performance of road construction projects in Machakos County, Kenya [Master’s thesis, University of Nairobi].
Christopher, M. (2018). Logistics & supply chain management (5th ed.). Pearson Education.
Dillman, D. A., Smyth, J. D., & Christian, L. M. (2014). Internet, phone, mail, and mixed-mode surveys: The tailored design method (4th ed.). John Wiley & Sons.
DiMaggio, P. J., & Powell, W. W. (1983). The iron cage revisited: Institutional isomorphism and collective rationality in organizational fields. American Sociological Review, 48(2), 147–160.
Eyaa, S., Ntayi, J. M., & Namagembe, S. (2011). Explaining non-compliance in public procurement in Uganda. International Journal of Business and Social Science, 2(11), 35–44.
Horvat, M., Mladenovic, G., & Nenad, S. (2021). The contribution of road infrastructure to economic development. Infrastructure Economics Journal, 5(1), 1–12.
Jabareen, Y. (2009). Building a conceptual framework: Philosophy, definitions, and procedure. International Journal of Qualitative Methods, 8(4), 49–62.
Karim, K., & Marosszeky, M. (2011). Improving construction project outcomes through effective training and development. Journal of Engineering, Design and Technology, 9(3), 231–247.
Karoki, W., & Mwangani, P. (2020). Influence of contract management on performance of public hospitals in Nairobi City County, Kenya. International Journal of Supply Chain and Logistics, 4(1), 46–69.
Kassa, R., Ogundare, I., Lines, B., Smithwick, J. B., Kepple, N. J., & Sullivan, K. T. (2023). Developing a construct to measure contractor project manager performance competencies. Engineering, Construction and Architectural Management. Advance online publication.
Kemboy, C. (2022). Infrastructure Challenges in African Road Construction Projects. African Journal of Project Management, 4(2), 77–88.
Khan, N. (2018). Contract Management. In Public Procurement Fundamentals: Lessons from and for the Field (pp. 63–72). Emerald Publishing Limited
Kilani, Q., Harahsheh, F., Najdawi, S., Khzouz, A., Al-badaineh, G., Abualfalayeh, G., & Hanandeh, A. (2024). Evaluating the impact of scope, time, cost, and quality management on project performance and business overall performance in the Jordanian financial sector. Journal of Project Management, 9(4), 301–310.
Kimemia, J. G. (2015). Determinants of projects delay in the construction industry in Kenya; The case of selected road projects implemented by Kenya National Highways Authority in Kenya’s Coast Region (Doctoral dissertation, University of Nairobi).
KURA Upper Eastern Reports. (2023). Quarterly Project Implementation Report. Kenya Urban Roads Authority.
Luka, R. N. (2016). Influence of public procurement practices on road construction projects implementation; a case of Kenya urban roads authority (KURA) Machakos (Doctoral dissertation, University of Nairobi).
Machira, A. M., Ajwang, P., & Kabubo, C. (2024). Assessment of the impact of sustainable procurement practices on the cost of road construction projects in Kenya: A case study of KeRRA. International Journal of Engineering Research & Technology (IJERT), 13(03).
Maendo, E., James, K., & Mugambi, F. (2018). Assessment of Road Maintenance Projects Performance. Journal of Civil Engineering, 8(1), 23–31.
Mahamid, I., Bruland, A., & Dmaidi, N. (2012). Causes of delay in road construction projects. Journal of Management in Engineering, 28(3), 300–310.
Mahamid, I., Sweis, G., & Assaf, S. A. (2012). Factors affecting construction project time and cost in Jordan. International Journal of Project Management, 30(5), 405-414.
Mawia Itumo, J., & Ngugi, K. (2016). Effect of contract management on procurement performance in NGOs in Nairobi County. Academic Journal of Social Sciences and Education, 4(1).
Meyer, J. W., & Rowan, B. (1977). Institutionalized organizations: Formal structure as myth and ceremony. American Journal of Sociology, 83(2), 340–363.
Montgomery, D. C., Peck, E. A., & Vining, G. G. (2012). Introduction to linear regression analysis (5th ed.). Wiley.
Muinde, M. (2022). Performance Measurement in Public Procurement. Journal of Procurement and Supply Chain, 5(2), 19–29.
Musau, A., & Kirui, P. (2018). Determinants of performance of government construction projects. International Journal of Procurement and Logistics, 6(3), 45–55.
Musyoka, L. M., & Mutuku, M. (2023). Influence of benchmarking on the performance of road infrastructure projects in Wajir County, Kenya. International Journal of Social Science and Humanities Research, 5(4), 45–58.
Mutua, J. M., Waiganjo, E., & Oteyo, I. N. (2014). The influence of contract management on performance of outsourced projects in medium manufacturing enterprises in Nairobi County, Kenya. International Journal of Business and Social Science, 5(9), 32–45
Nsanzimana, J., & Mulyungi, P. (2020). Effect of contract management practices on performance of road construction projects in Kigali: A case of Rwandex-Remera road construction project. International Journal of Science and Research (IJSR), 9(10), 1739–1745
Okello, A. M. (2021). Monitoring and evaluation data management and project performance: A review on infrastructure projects. Research & Development, 2(3), 43–49.
Pallant, J. (2016). SPSS survival manual: A step-by-step guide to data analysis using IBM SPSS (6th ed.). Maidenhead, UK: Open University Press/McGraw-Hill.
Pariafsai, F., & Behzadan, A. H. (2021). Core competencies for construction project management: Literature review and content analysis. Journal of Civil Engineering Education, 147(2), 04021010.
Perera, O., & Colverson, S. (2012). Sustainable Procurement in Infrastructure Projects. International Institute for Sustainable Development.
Prahinski, C., & Benton, W. C. (2004). Supplier evaluations: Communication strategies to improve supplier performance. Journal of Operations Management, 22(1), 39–62.
Rehan, A. K., Thorpe, D. S., & Heravi, A. H. (2024). Leadership practices and communication framework for project success: The construction sector. International Journal of Construction Management. Advance online publication.
Salome, O. L. (2018). Contract management practices and performance of housing construction projects in Nairobi City County, Kenya: A case of National Construction Authority (Master’s thesis). Kenyatta University, Nairobi, Kenya
Scott, W. R. (2004). Institutional theory: Contributing to a theoretical research program. In K. G. Smith & M. A. Hitt (Eds.), Great Minds in Management: The Process of Theory Development (pp. 460–485). Oxford, UK: Oxford University Press.
Sunindijo, R. Y., & Zou, P. X. W. (2011). CHPT construct: Essential skills for construction project managers. International Journal of Project Organization and Management, 3(2), 139–163.
Waithera, K. B., & Susan, W. (2019). Factors affecting cost overruns in construction projects a case of Kenya National Highways Authority. International Journal of Business Management and Finance, 1(1).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Kithinji Makena Immaculate, Mathias Nzomo Muinde, Agnes Mungania

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution (CC-BY) 4.0 License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.