Procurement Cycle Process and Performance of Public Level 5 Hospitals in Nairobi City County, Kenya
DOI:
https://doi.org/10.47941/ijscl.4104Keywords:
Procurement Cycle Process, Procurement Planning, Sourcing and Performance of Public Level 5 HospitalsAbstract
Purpose: The study sought to establish the effect of procurement planning on performance of public level 5 hospitals in Nairobi City County, Kenya, to determine the effect of sourcing on performance of public level 5 hospitals in Nairobi City County, Kenya. This study was guided by Goal Setting Theory and The Resource-Based View (RBV) Theory.
Methodology: This study adopted a descriptive research design. This study targeted level 5 public referral hospitals in Nairobi city county, Kenya. According to MoH report (2024) there are three public level 5 referral hospitals in Nairobi city county and they include; Pumwani Maternity Hospital, Mama Lucy Kibaki Hospital and Mbagathi County Hospital. There are a total of 207 procurement employees in the three hospitals. The Yamane formula was adopted to calculate the study sample of 136 respondents. The study used structured questionnaires as the main data collection instrument. Quantitative data was coded then analyzed using Statistical Package for Social Sciences (SPSS) computer software version 28. Descriptive statistics was used to analyze the data in frequency distributions and percentages which were presented in tables and figures. The study also analysed the data using inferential statistics which comprised of correlation analysis and regression analysis.
Findings: The study concludes that procurement planning has a positive and significant influence on performance of public level 5 hospitals in Nairobi City County, Kenya. In addition, the study concludes that sourcing has a positive and significant effect performance of public level 5 hospitals in Nairobi City County, Kenya.
Unique Contribution to Theory, Practice and Policy: Based on the findings, the study recommends that public level 5 hospitals in Kenya should strengthen sourcing practices by adopting transparent, competitive, and reliable supplier selection processes that prioritize quality, cost-effectiveness, and timely delivery of goods and services. Hospital management should evaluate suppliers based on their capacity, reliability, compliance, and ability to consistently meet hospital requirements.
Downloads
References
Abdullah, A. Z, Rahman, H. D., & Awang, M. S. (2020). Identification of the major order management issues in oil and gas industry in Malaysia. International Journal of Business and Social Science, 2(11), 182-194
Alfatian, N., Cahyadi, E. R., & Mulyati, H. (2025). Improving the quality of procurement process through lean six sigma in the Indonesian public rail transport company. Jurnal locus: Penelitian & Pengabdian, 4(7), 4566-4579.
Atego, C. O., & Theuri, F. S. (2023). Effects of public procurement cycle process on organization performance. International Journal of Scientific and Research Publications, 5(9), 1-6.
Kamau, J. K., & Njeru, P. (2025). Sourcing on the performance of selected food manufacturing firms in Kiambu County, Kenya. African Journal of Empirical Research, 6(3), 90-96
Kibogo, A. D., & Mwangangi, M. (2020). Factors affecting contract management in public procurement sector in Kenya: a case of Kenya literature bureau. European Journal of Business Management, 1(11), 377-384.
Koomson, E. S. B, Ampong, A. E., & Asibey, O. (2021). Sourcing and its associated challenges in the mining industry in Ghana. Science Journal of Business and Management, 9(4), 269-280
Kuloba, E. (2023). Effect of procurement cycle process on organizational performance: a case of Moi teaching and referral hospital, Eldoret. Retrieved from http://repository.kisiiuniversity.ac.ke:8080/
Kushnirenko, O., & Gakhovych, N. (2023). Planning of the industrial recovery in Ukraine based on sustainable development. Retrieved from https://dspace.nuft.edu.ua/
Lerai, S.E, Rintari, N., & Moguche, A. (2023). Influence of planning on the organizational performance among commercial-based parastatals in Kenya. Journal of Business and Strategic Management, 8(1), 77-81
Loewe, M., & Albrecht, H. (2022). Social contract in Egypt, Lebanon and Tunisia: What do the people want? Retrieved from https://onlinelibrary.wiley.com/doi/pdfdirect/
Mensah, C., & Tuo, G. (2022). Evaluation of procurement cycle process and its Operational Performance in the Public Sector of Ghana: A Case Study of Komfo Anokye Teaching Hospital and Kumasi Polytechnic. European Journal of Business and Management, 5(29), 121-133.
Muhia, D. W., & Afande, F. O. (2024). Adoption of procurement cycle process and Procurement Performance in State Corporations in Kenya (A Case of Kenya Revenue Authority). Industrial Engineering Letters, 5(6), 1-25.
Murasandonyi, J., & Gitahi, N. (2022). The effect of procurement cycle process on the operational performance of airlines in Rwandan air Ltd. Journal of Procurement & Supply Chain, 6(2), 21–40.
Musau, P. M., & Kirui, C. (2023). Order management practices and implementation of government projects in Kenya, case of Machakos County government. International Academic Journal of Information Sciences and Project Management, 3(2), 58-79
Mutua, J. M, Waiganjo, E., & Oteyo, I. N. (2020). The influence of contract management on performance of outsourced projects in medium manufacturing enterprises in Nairobi County, Kenya. International Journal of Business and Social Science, 5(9), 25-33
Ocharo, R. N., & Kimutai, G. (2020). Order management practices and implementation of power projects in Kenya. International Academic Journal of Information Sciences and Project Management, 3(1), 28-46
Ogunde, A. O, Afolabi, O. A. O., & Ojelabi, J. O. R. (2020). Challenges confronting construction order management system for sustainable construction in developing countries: professional’s perspectives (a case study of Nigeria). Journal of Building Performance, 8(1), 1-11
Ogunsanmi, O. E. (2023). Effects of procurement cycle process on construction project performance in Nigeria. Ethiopian Journal of Environmental Studies and Management, 6(2), 215-223
Okello, T. M., & Kihara, A. (2022). Effect of procurement cycle process on performance of government ministries in Kenya. International Journal of Supply Chain and Logistics, 3(2), 105–128.
Oloitiptip, S. L., & Ndeto, C. (2023). Sourcing process and performance of selected cement manufacturing companies in Kenya. International Journal of Social Sciences Management and Entrepreneurship, 7(1), 388-387
Omolo, E. J. (2021). Factors influencing implementation of order management in public-funded projects in Kenya – the case of Kenya Pipeline Company, Nairobi County. Retrieved from https://erepository.uonbi.ac.ke/bitstream/handle/
Yusuf, W. M, Mukulu, E., & Oloko, M. (2020). Influence of planning to firm performance in agricultural research based institutions of Kenya. Journal of Management and Sustainability, 8(4), 83-95
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Alice Chepngeno, Dr. Paul Machoka

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution (CC-BY) 4.0 License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.