Impact of Risk Management on the Successful Completion of Construction Projects in Public Primary Schools: A Case Study of Dodoma Urban District, Tanzania
DOI:
https://doi.org/10.47941/jepm.3374Keywords:
Risk Management, Successful Completion, Construction Projects, Public Primary Schools, TanzaniaAbstract
Purpose: The purpose of the study was to assess the impact of risk management on the successful completion of construction projects in public primary schools in Dodoma Urban District, Tanzania.
Methodology: Explanatory research design were used. Structured questionnaires were used for data collection from 320 respondents who were selected using simple random sampling technique. The collected data were analysed using descriptive statistics and multiple linear regression analysis.
Findings: The study concluded that effective risk management through identification, analysis and regular monitoring is key to successful construction projects. These elements work together to address challenges, ensure timely completion, control costs, improve quality, and promote accountability and transparency in project management.
Unique Contribution to Theory, Policy and Practice: The study concluded that effective risk identification, risk analysis and regular risk monitoring enhance timely completion and improve the overall quality of construction projects. The findings contribute to theory by empirically strengthening Risk Management Theory and demonstrating its applicability in public primary school construction projects. They further inform policy by highlighting the need for institutionalized risk assessment guidelines, capacity-building and consistent monitoring frameworks within local government construction procedures. In practice, the study provides actionable insights for project managers and contractors to adopt structured, proactive risk management approaches that minimize delays, cost overruns and quality shortcomings.
Downloads
References
Abeid, K., & Libua, E. (2023). Factors affecting quality management processes in government construction project activities: A case of Arusha City council. (Master Dissertation, the Institute of Accountancy Arusha).
Aenet, Y., Maniha, N. (2022). Factors influencing the quality of construction projects in public universities. International Journal of Business, Management, and Economics, 4(1), 13 - 31.
Ahamed, J. M. Z. (2023). A review of the life cycle of construction projects critical risk factors. Journal of Advances in Civil Engineering and Management, 6(3), 11-16.
Aikpokhio, B. N., Gambo, N., Ogedengbe, F. A., & Nwoye, M. I. (2024). Risk management practices and performance of construction projects: evidence from selected estate management companies in FCT Abuja. European Journal of Logistics, Purchasing and Supply Chain Management, 12(1), 1-19.
Ajayi, O. O., Yakub, B. A., & Borisade, T. (2022). Relevance of risk management in the delivery of construction projects in developing countries. LAUTECH Journal of Civil and Environmental Studies, 8(2), 70-82.
Algremazy et al. (2023). The effect of risk management practices on project performance: a case study of the Libyan construction industry. International Journal of Professional Business Review, 8(6), 1-20.
Alhammadi, S. A., Tayeh, B. A., Alaloul, W. S., & Salem, T. S. (2021). Risk management strategies in construction organizations. The Open Civil Engineering Journal, 15(2021), 406-413.
Alharahshehzx, H. H., & Pius, A. (2020). A Review of key paradigms: Positivism against interpretivism. Global Academic Journal of Humanities and Social Sciences, 2(3), 39-43.
Almukahal, .A, A. M. (2020). Risk management of construction projects. Engineering Management Research, 9.
Alsaadi, N. (2023). The Impact of risk management practices on the performance of construction projects. Estudios de Economia Aplicada, 39(4), 1-10.
Anastasiu, L., Câmpian, C., & Roman, N. (2023). Boosting construction project timeline: the case of critical chain project management (CCPM). Buildings, 13(2023), 1-35.
Bahamid, R. A., Doh, S. I., Khoiry, M. A., Kassem, M. A., & Al-Sharafi, M. A. (2022). The current risk management practices and knowledge in the construction industry. Buildings, 12(2022), 1-13.
Bhardwaj, P. (2022). Types of sampling in research. Journal of Practical Cardiovascular Science, 5(3), 157-163.
Borole, S. P., & Attarde, P. M. (2021). Qualitative risk analysis & risk response planning for construction project. International Journal of Creative Research Thoughts (IJCRT), 9(4), 2007-2026.
Chamuwange, S. K., & Ning, Y. (2022). Identifying the factors affecting the cost management of road construction projects in Tanzania: Review paper. Journal of Civil, Construction & Environmental Engineering, 7(3), 35-39.
Chen, H. L. (2023). Communication capacity and project performance: The mediating role of managerial capacity. Journal of Survey in Fisheries Sciences, 10(1), 3970-3973.
Coleman, P. (2021). Validity and reliability within qualitative research in the caring Sciences. International Journal of Caring Sciences, 14(3), 2041-2045.
Crispim, J., Silva, L. H., & Rego, N. (2019). Project risk management practices: The organizational maturity influence. Int. J. Manag. Proj. Bus., 12(2019), 187–210.
Dawadi, S., Shrestha, S., & Giri, R. A. (2021). Mixed-methods research: A discussion on its types, challenges, and criticisms. Journal of Practical Studies in Education, 2(2), 25-36.
Dixit, S. (2020). Study of factors affecting the performance of construction projects in AEC industry. Organization, Technology and Management in Construction, 11(2020), 2275–2282.
Dutta, S. (2023). The Theory of Constraints: A Framework for Enhancing Efficiency and Promoting Growth. American International Journal of Business Management (AIJBM), 6(120), 36-44.
Eliufoo, H. (2019). Project team perception of causes of building cost overruns: A reflection in Tanzania. Journal of Civil Engineering & Architecture, 11(2019), 149-158.
Gasana, E., & Irechukwu, E. N. (2023). Monitoring and evaluation practices and performance of projects in Rwanda: A case of building learning foundations (BLF) project of British Council in Rwanda. Stratford Peer Reviewed Journals and Book Publishing Journal of Entrepreneurship & Project Management, 7(7), 96-113.
Gateka, H. N. (2022). Effect of risk management on rabbit project success: A case of Rabbit Ltd Rwanda. International Journal of Management & Commerce Innovations, 10(2), 386-393.
Gitahi, S. M., & Tumuti, J. (2019). Management of contracting risks on performance of construction projects in Kilifi County, Kenya. International Academic Journal of Information Sciences & Project Management, 3(3), 105-130.
Gyamfi, T. A., Pratt, L., & Nana-Addy, E. (2018). Assessing the effect of risk on public and private construction projects performance in Ghana: Consultant perspective. International Journal of Construction Engineering & Management, 7(5), 185-192.
Handema, M., Lungu, J., Chabala, M., & Shikaputo, C. (2023). Conceptualizing the philosophical underpinning of the study: A practical perspective. Open Journal of Philosophy, 13(2023), 257-268.
Hansen, L. M. (2021). Impact of continuous monitoring on educational infrastructure development: A case study in Norway. Journal of Construction Management, 15(3), 45-67.
Ibrahim, H. N. (2023). Mainstreaming of monitoring and evaluation through funding and sustainability of building construction projects at Kenya school of government in Embu County, Kenya. International Journal of Economics, Commerce & Management, 11(6), 1-16.
Jarantow, S. W., Pisors, E. D., & Chiu, M. L. (2023). Introduction to the use of linear and nonlinear regression analysis in quantitative biological assays. Current Protocols, 3(2023), 1-56.
Jiaoa, M. J., & Sang, C. N. (2023). Assessing the reliability and validity of research instruments for measuring youth purchase intention in Xi'an, China: A pilot testing. 47-56.
Kangsoo, K., Jinoh, K., Donghyung, Y. (2021). Analysis of features affecting contracted rate of return of Korean PPP projects. Sustainability, 13(2021), 3311.
Kazare, B. (2019). Determination of factors influencing construction project performance in public institutions. A case of Musoma and Butiama district council. (Master's dissertation, Mzumbe University).
Kibera, P. O., & Ngoya, S. R. (2022). Risk assessment techniques in public sector construction projects: evidence from Dodoma Urban District. Tanzania Journal of Engineering Sciences, 5(1), 25-39.
Kihinga, P. L., (2023). Longitudinal analysis of completed projects in Dodoma from 2020-2023. International Journal of Project Management, 29(4), 102-118.
Kihwele, J., & Nduku, P. M. (2023). Building better schools: A study on infrastructure development in Tanzania. African Journal of Educational Management, 29(1), 78-95.
Kissi, E., Agyekum, K., Baiden, B. K., & Tannor, R. A. (2019). Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 124(2019), 1-21.
Kowalski, J. (2021). Risk management in construction projects: A case study of public primary schools. Journal of Construction Engineering and Management, 147(3), 04021001- 040210010.
Lee, M. (2023). Linking risk management practices to profitability: Evidence from various industries. Strategic Management Journal, 44(7), 1234-1256.
Madushanka, H. K. P., & Tilakasiri, K. K. (2020). The identification and management of major risks in Sri Lankan construction industry. Journal of Economics & Finance, 11(1), 16-23.
Maksimović, J., & Evtimov, J. (2023). Positivism and post-positivism as the basis of quantitative research in pedagogy. Research in Pedagogy, 13(1), 208-218.
Manuputty, N. A., & Nursin, A. (2023). The effect of project communications management on project time performance. Applied Research on Civil Engineering and Environment (ARCEE), 4(1), 9—21.
Masengesho, E., Wei, J., Umubyeyi, N., & Niyirora, R. (2020). A review on the role of risk management and value engineering tools for project successful delivery. World Journal of Engineering and Technology, 9(1), 109–127.
Mchopa, A. D. (2020). Applicability of force account approach in procurement of works in Tanzania. Journal of International Trade, Logistics & Law, 6(2), 137-143.
Mchopa, E. S., & Kihinga, D. A. (2023). Evaluating the role of risk management strategies on successful completion of educational infrastructure projects: Insights from Dodoma. International Journal of Project Management, 41(2), 101-115.
Mellado, F., Lou, E. C., Becerra, C. L. (2020). Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement. Eng. Constr. Archit. Manag, 27(2020), 579–608.
Mhando, J. (2021). Risk factors affecting project completion timelines in Dodoma’s educational sector. Journal of Construction Management, 12(3), 45-60.
Mhando, L., & Mhando, A. (2021). Assessment of school infrastructure quality in Tanzania. Journal of Educational Planning and Administration, 34(2), 145-162.
Mishra, A. K. (2020). Implication of the Theory of Constraints in project management. International Journal of Advanced Trends in Engineering & Technology (IJATET), 5(1), 1-13.
Mokhothu, T. (2022). Assessing risk identification practices in school construction projects: A South African perspective. Journal of Construction Engineering & Management, 148(3), 114-129.
Mshuza, S. Y., Yusuf, M., & Ngatia, D. (2023). Project risk management practices and performance of public schools construction projects in Mara region, Tanzania. International Journal of Management and Commerce Innovations, 11(1), 41-52.
Murungi, T. M. (2020). Determinants of sustainability of community-based ecotourism development projects in Kenya. A case of Northern Rangeland Trust Conservancy, Meru County (Doctoral dissertation, University of Nairobi).
Mutula, P. K. O., & Engairo, P. (2024). Effect of risk identification on project implementation among faith based construction projects in the diocese of Ngong. International Journal of Social Science & Humanities Research, 2(1), 31-39.
Mutula, P. K. O., Omwenga, J. Q., & Kimathi, D. (2023). Effect of risk management practices on project implementation among faith-based organizations in Kenya: A case of construction projects in the Catholic Diocese of Ngong. The Strategic Journal of Business & Change Management, 10(2), 901–921.
Mwanza, J. M., & Mhando, A. J. (2021). Assessing the impact of risk management practices on project performance: A case study of public primary school construction projects in Dodoma. Journal of Construction Project Management, 12(3), 45-60.
Nabudere, G. (2022). Assessing risk management practices in school construction projects: Evidence from Uganda. International Journal of Project Management, 40(5), 567-578.
NAOT. (2021). Performance Audit Report on Monitoring and Supervision of Projects implemented through force account method in education sector. National Audit Office of Tanzania (NAOT), Dodoma.
Ndomba, P. K. (2022). The effects of project planning, monitoring and evaluation on public projects performance (A case of Mbinga district council. (Master dissertation, Institute of Accountancy Arusha).
Nyarangi, M. H., Ogolla, P., & Kitheka, S. (2021). Effect of project risk management processes on performance of borehole projects in Mombasa County, Kenya. The Strategic Journal of Business & Change Management, 8(2), 292 – 311.
Obonadhuze, B. I., Eze, C. E., Siunoje, L. U., & Sofolahan, O. (2021). Causes and effects of ineffective communication on construction projects. Borneo Journal of Sciences & Technology, 3(1), 77-92. http://doi.org/10.3570/bjost.2021.3.1-11
Osunsanmi, T. O., Aigbavboa, C. O., Thwala, W. D., & Oke, A. E. (2022). Construction supply chain management in the fourth industrial revolution era. Emerald Publishing Limited Howard House: UK
Park, Y., Konge, L., &Artino, A. R. (2020). The positivism paradigm of research. Academic medicine: Journal of the Association of American Medical Colleges, 95(5), 690-695.
Robbertse, C. (2020). The effects of the project managers’ skills on construction productivity. (Master Dissertation, the University of the Free State).
Salim, R. J., & Macha, L. J. (2023). Effects of procurement procedures on performance of public building construction in the Ministry of Education and Vocational Training, Zanzibar. International Journal of Business Management & Economic Review, 6(3), 56-97.
Samuel, T., & Benard, N. O. (2020). The influence of project management skills on implementation of physical projects in secondary schools. IOSR Journal of Research & Method in Education (IOSR-JRME), 10(6), 16-21.
Schmidt, H-J. (2021). Risk management in educational infrastructure projects: A case study of public primary schools. International Journal of Project Management, 39(4), 345-358.
Shakeri, H., & Khalilzadeh, M. (2020). Analysis of factors affecting project communications with a hybrid DEMATEL-ISM approach (A case study in Iran). Heliyon, 30(40), 1-18.
Sharma, S., & Gupta, A. K. (2019). Risk identification and management in construction projects: Literature review. International Journal of Humanities, Arts & Social Sciences, 5(6), 224-231.
Sospeter, N. G., & Chileshe, N. (2021). Risk handling responsibilities in Tanzanian project-based organisations. Sustainability, 13(2021), 1-18.
Sospeter, N. G., Rwelamila, P. D., Gimbi, J. (2020). Critical success factors for managing post disaster reconstruction projects in Angola. Constr. Econ. Build. J. 2020, 1-20.
Stephen, K. (2021). Use of force account procurement method for development of small and medium contracting firms in Mbeya, Tanzania. International Journal of Finance Research, 2(2), 94-110.
Sugiarta, R. D., Arofiati, F., & Rosa, E. M. (2023). Validity and reliability of research instruments on the effect of motivation on nurse performance in moderation with nurse credentials. MMR (Jurnal Medicoeticolegal dan Manajemen Rumah Sakit), 12(1), 46-55.
Taherdoost, H. (2021). Data collection methods and tools for research: A step-by-step guide to choose data collection technique for academic and business research projects. International Journal of Academic Research in Management (IJARM), 10(1), 10-38.
Tanaka, H. (2022). Evaluating the role of monitoring systems in school construction projects: insights from Japan. International Journal of Educational Infrastructure, 10(2), 112-130.
Tembo, M., Mwanaumo, E. M., & Kahanji, C. (2023) Improving procurement selection criteria for managing construction tender-price volatility on public projects. European Journal of Logistics, Purchasing & Supply Chain Management, 11(1), 1-25.
Tessema, A. T., Alene, G, A., & Wolelaw, N. M. (2022). Assessment of risk factors on construction projects in Gondar city, Ethiopia. Heliyon, 8(2022), 1-11.
The Republic of Tanzania. (2020). School construction and maintenance strategy 2019-2028. Ministry of Education, Science and Technology.
The United Republic of Tanzania. (2022). The Tanzania housing and population census 2022: A panacea for local service delivery and development drawbacks. Local Administration Journal, 15(1), 1-13.
United Nations Educational Scientific and Cultural Organisation (UNESCO). (2022). Global education monitoring report. UNESCO Publishing.
United Republic of Tanzania (URT). (2020). Standards for school construction. Government of Tanzania.
URT. (2018). Basic Education Statistics in Tanzania. Ministry of Education, Science and Technology.
URT. (2020). School construction and maintenance strategy 2019-2028. Ministry of Education, Science and Technology.
Watanabe, W. C., Shafiq, M., Alic, S., Nawazd, M. J., & Nazeer, S. (2024). The impact of triple constraints on the project success, a moderating role of organizational support. Journal of Project Management, 9(2024), 73–84.
Wodon, Q. (2019). Expanding access to ordinary level secondary schools in Tanzania: Simple rules for allocating new schools or expanding existing schools. World Bank
World Bank Group. (2023). Tanzania - education sector review. World Bank Publications.
Zain et al. (2023). Ineffective site management practices and their impacts on project performance. School of Civil Engineering, Faculty of Engineering, Universiti Teknologi Malaysia, 81310 Johor Bahru, Johor, Malaysia.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Pascal Tuja, Dr. Francis W. Mmari

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution (CC-BY) 4.0 License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.