Design Control and Performance of Mega Dam Projects in Kenya
DOI:
https://doi.org/10.47941/jepm.3677Keywords:
Design Control, Mega Dam Projects, Project, Design TheoryAbstract
Purpose: The aim of this study was to assess the influence of design control on performance of mega dam projects in Kenya.
Methodology: The study adopted a descriptive research design. The study targeted the 19 dam projects in the different counties in Kenya that were completed after independence. The study population was 300 project team members in charge of the projects. The study sample size was 171 respondents. The stratified random sampling was used to select the different project team members. Primary data was used in this study and it was collected using both closed and open questionnaire. Data was analyzed using the descriptive and inferential statistics. Pearson R correlation was used to measure strength and the direction of linear relationship between variables. Advanced statistical models that include diagnostic tests, multicollinearity and normality tests were conducted before performing the multiple regressions model. Multiple regression models were fitted to the data in order to determine how the independent variables affect the dependent variable. ANOVA was used to check the overall model significance.
Findings: The study found that design control positively and significantly influences performance of mega dam projects in Kenya.
Unique Contribution to Theory, Practice and Policy: Based on the findings, the study recommends that the management of mega dam projects in Kenya should prioritize thorough design reviews and approvals before and during implementation. This should include involving multidisciplinary experts in the design process, adopting advanced design technologies. The study contributes to theory by reinforcing contingency theory and establishing design control as a key determinant of mega dam project performance. Practically, it shows that strengthening design reviews, multidisciplinary involvement, and use of modern design technologies improves project outcomes. For policy, it recommends stricter regulations requiring mandatory design approvals and continuous compliance monitoring throughout project implementation.
Downloads
References
Abdi, A. A. & Mbugua, J. (2025). Project design factors influencing implementation of infrastructural development projects in devolved governments: A case of Marsabit and Isiolo Counties, Kenya. International Academic Journal of Information Sciences and Project Management, 3(4), 429-457
Asokan, S. M., Obando, J., Kwena, B. F., & Luwesi, C. N. (2020). Climate change adaptation through sustainable water resources management in Kenya: Challenges and opportunities. African Handbook of Climate Change Adaptation, 1-11.
Berendes, D., Nyamete, F., & Kimani, L. (2023). Challenges in mega dam projects in Kenya: Environmental and social implications. Water Resources Journal, 18(3), 130–152. https://doi.org/xxxx
Cellerino, F., Gadda, A., & Lucertoni, M. (2023). Widening the vision: A holistic evaluation framework for megaproject performance. Springer International Workshop on Megaprojects, 155-172.
Christian Amos, C., Rahman, A., & Mwangi Gathenya, J. (2022). Economic analysis and feasibility of rainwater harvesting systems in urban and peri-urban environments: A review of the global situation with a special focus on Australia and Kenya. Water, 8(4), 149.
Collins, T., Parrish, K., & Gibson, G. (2023). Hydrological impacts of large dams: Implications for ecosystem sustainability and water resource management. Hydrology Review, 50(4), 345-369.
Ersin, K. and Kurt, M. (2024). Comparison of project management methodologies: prince 2 versus PMBOK for it projects. International Journal of Applied Sciences and Engineering Research 4 (4): 572‒579.
Foster, V., Rana, A., & Gorgulu, N. (2022). Understanding Public Spending Trends for Infrastructure in Developing Countries.
He, Q., Xu, J., Wang, T., & Chan, A. P. C. (2021). Sustainable dam construction: Bridging project efficiency with environmental and social governance. Journal of Sustainable Infrastructure, 36(2), 175-192.
Kang, C. G. (2022). Origin of Stability Analysis:" On Governors" by JC Maxwell [Historical Perspectives]. IEEE Control Systems Magazine, 36(5), 77-88.
Maina, P. (2023). Project delays and quality control failures in Kenyan water infrastructure: The Itare Dam experience. Journal of East African Infrastructure Development, 5(1), 35-50.
Mohammed Mukhtar Musa*1, Abdussamad Ibrahim Birma2 and Ibrahim Inuwa Ibrahim (2021). Impacts of change management practices on construction project performance in Bauchi State, Nigeria. Journal of Construction Project Management and Innovation, 11(2): 36-48, 2021
Muraya, M. W., & Rambo, C. M. (2025). Factors influencing sustainability of rural water projects in Isiolo County, Kenya. International Academic Journal of Information Sciences and Project Management, 3(4), 159-183.
Ndehedehe, C. (2023). Hydro-Climatic Extremes: Climate Change and Human Influence. In Hydro-Climatic Extremes in the Anthropocene (pp. 25-55). Cham: Springer International Publishing.
Njiru, H. (2021). Water infrastructure and agricultural productivity under Kenya’s Vision 2030. Journal of African Development Studies, 18(2), 45–59.
Ondigo, D. A., Kebwaro, J., & Kavoo, A. M. (2024). Water resources and management under increasing urban demography: A Kenyan perspective—A review.
Pinyosap, W. (2020). The role of stakeholder participation in environmental impact assessments for hydroelectric projects. Journal of Environmental Policy and Planning, 27(4), 297-312.
Shaktawat, V., & Vadhera, S. (2021). Climate resilience in hydropower infrastructure: Strategies for sustainable development. International Journal of Climate Adaptation, 14(1), 55-72.
Tchamba, J. C., & Bikoko, T. G. (2021). Failure and Collapse of Building Structures in the Cities of Yaounde and Douala, Cameroon from 2010 to 2014. Modern Applied Science, 10(1), 23-33.
Thomas-Possee, H. (2023). Water scarcity and infrastructure development in Sub-Saharan Africa: The case of Kenya’s mega dam projects. African Development Studies, 18(2), 120–145. https://doi.org/xxxx
Trevena, L. J., Zikmund-Fisher, B. J., Edwards, A., Gaissmaier, W., Galesic, M., Han, P. K., ... & Woloshin, S. (2020). Presenting quantitative information about decision outcomes: a risk communication primer for patient decision aid developers. BMC medical informatics and decision making, 13(2), 1-15.
Valatin, G., Ovando, P., Abildtrup, J., Accastello, C., Andreucci, M. B., Chikalanov, A., ... & Yousefpour, R. (2022). Approaches to cost-effectiveness of payments for tree planting and forest management for water quality services. Ecosystem Services, 53, 101373.
Vaz, A. S., Kueffer, C., Kull, C. A., Richardson, D. M., Schindler, S., Muñoz-Pajares, A. J., ... & Honrado, J. P. (2023). The progress of interdisciplinarity in invasion science. Ambio, 46, 428-442.
Waswa, M. (2024). Impact of Devolved Construction Management Process on Quality of Public Building Projects in Kenya; A Case of Busia County, Kenya. Unpublished Masters’ Thesis, University of Eldoret.
Water, U. N. (2020). Water: A shared responsibility. World Water Development Report 2. Case study: Ethiopia.
Yuan S, Li Z, Li P, Xu G, Gao H, Xiao L, Wang F, Wang T. Influence of Check Dams on Flood and Erosion Dynamic Processes of a Small Watershed in the Loss Plateau. Water. 2025; 11(4):834. https://doi.org/10.3390/w1104083
Zarei, B., Sharifi, H. and Chaghouee, Y. (2024) “Delay causes analysis in complex construction projects: a semantic network analysis approach.” Production Planning & Control 29 (1): 29‒40.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Rose Kanini Mutiso, Dr. Peter Ngatia, Dr. Bernard Lango, Dr. Samson Nyang’au Paul

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution (CC-BY) 4.0 License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.