INFLUENCE OF RISK MANAGEMENT ON SUPPLY CHAIN PROJECTS IN KENYA - A CASE OF DELOITTE KENYA
DOI:
https://doi.org/10.47941/ijscl.305Keywords:
Risk Planning, Risk Response, Risk monitoring, Risk AssessmentAbstract
Purpose:This study examined the Influence of Risk Management on Supply Chain Projects in Kenya. Risk Management is a critical issue in the industry. The study sought to assess Influence of Risk Management on Supply Chain Projects in Kenya.
Methodology:The study adopted a descriptive survey design. The target population of the study was all the completed (566) Supply Chain Projects in Deloitte within the 2013 to 2017 strategic year period. The study used self-structured questionnaires to collect primary data from respondents and the data collected was cleaned, pretested, validated, coded, summarized and analysed using statistical package of SPSS V23. The study findings were presented using bar charts and pie charts. .
Results:The study found that the project managers had conceptual skills, technical skills, cost management skills, which positively influence Risk Management of supply chain projects. In addition, the study established that technological literacy and awareness, projects tools and equipment, skilled manpower, manpower training capacity, technological innovation, analytical and computational capacity and project team's knowledge on ICT influence Risk Management in supply chain projects. Further, the study found that schedule development, schedule crashing, schedule compression, sequence of activities and schedule fast tracking influence Risk Management in supply chain projects. Also, the study found that factors such as the GDP cost of relocation of public utilities, inflation rates, variation of cost of labor, equipment hire rates, government debt service ratio, competing demands for government funds and unemployment rates influence Risk Management in supply chain projects.
Contribution to policy and practice:Based on the study findings, the study concludes that risk planning influences Supply Chain Projects.The study also recommends that the government of Kenya should revise the current monitory policy governing inflation rates and foreign exchange rates so as to ensure the stability of foreign exchange rates and reduction in inflation rate.
Downloads
References
Alinaitwe, H., Mwakali, J., & Hasson, B. (2007). Analysis of accidents on building sites reported in Uganda during 2001-2005. Retrieved from https://www.irbnet.de/daten/iconda/CIB4931.pdf
Apolot, R., Alinaitwe2, H., & Tindiwensi, D. (2013). An Investigation into the Causes of Delay and Cost Overrun in Uganda's Public Sector Projects. Retrieved from http://web.usm.my/jcdc/vol18_2_2013/JCDC%2018(2)%202013-Art.%203%20(33-47).pdf
Baccarini, D. (1999, January). The Logical Framework Method for Defining Project Success. Retrieved from https://www.researchgate.net/publication/259268056_The_Logical_Framework_Method_for_Defining_Project_Success
Bertalanffy, L. v. (1950). An Outline of General System Theory (1950). Retrieved from http://www.isnature.org/Events/2009/Summer/r/Bertalanffy1950-GST_Outline_SELECT.pdf
Chan, A. P. (2004). Key performance indicators for measuring success. Retrieved from http://www.emeraldinsight.com/doi/abs/10.1108/14635770410532624
Chan, A. P., & Chan, D. S. (2004). Factors Influencing the Success of a Project. Retrieved from http://chur.chu.edu.tw/bitstream/987654321/39062/2/Factors+Influencing
Cheung, S. O., Suen, H. C., & Cheung, K. K. (2004). PPMS: a Web-based Project Performance Monitoring System. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.459.9739&rep=rep1&type=pdf
Cheung, Wong, P. S., & Yiu, T. W. (2015). the soft power of contracting organisation. Retrieved from https://books.google.co.ke/books?id=AoEcBgAAQBAJ&pg=PA38&dq=cheung+wong+and+pang+the+soft+power+of++contracting+organisation&hl=en&sa=X&redir_esc=y#v=onepage&q=cheung%20wong%20and%20pang%20the%20soft%20power%20of%20%20contracting%2
Cho, K., Hong, T. o., & Hyun, C. T. (2009, September). Effect of project characteristics on project performance in projects based on structural equation model. Retrieved from http://www.sciencedirect.com/science/article/pii/S0957417409000736
Chuan, Q. T. (2006). Environmental factors and work performance of project managers in the industry. Retrieved from http://www.sciencedirect.com/science/article/pii/S0263786305000633
Cowell, F. A., & Gardiner, K. (1999). Welfare weight. Retrieved from http://darp.lse.ac.uk/papersDB/Cowell-Gardiner_(OFT).pdf
Crawford, L., & Pollack, J. (2004). Hard and soft projects: a framework for analysis. Retrieved from https://opus.lib.uts.edu.au/bitstream/10453/4860/1/2004001481.pdf
EISENHARDT, K. M. (1985, February). CONTROL: ORGANIZATIONAL AND ECONOMIC APPROACHES. Retrieved from https://business.illinois.edu/josephm/BA549_Fall%202012/Session%205/5_Eisenhardt%20(1985).pdf
Eliyahu, G. (1988). Computerized Shop Floor Scheduling. North River Press.
Energy Sector Management Assistance Program (ESMAP). (2010). 2010 Annual Report. Retrieved from http://documents.worldbank.org/curated/en/408911468331735129/pdf/632210AR0ESMAP00Box0361508B0PUBLIC0.pdf
Enhassi, A., Najjar, J. a., & Kumaraswamy, M. (2009). Delays and cost overruns in the projects in the Gaza Strip. Retrieved from http://www.emeraldinsight.com/doi/abs/10.1108/13664380910977592
ESMAP/ASTAE Annual Report 2014. (2014). ESMAP/ASTAE Annual Report 2014. Retrieved from http://www.esmap.org/sites/esmap.org/files/DocumentLibrary/ESMAP_ASTAE_Annual_Report_2014_v2_Optimized.pdf
European Commission. (2012, February). The European Development Fund in a few words. Retrieved from http://www.pedz.uni-mannheim.de/daten/edz-l/gdd/02/fed_en.pdf
Faridi, A. S., & El"Sayegh, S. M. (2006). Significant factors causing delay in the UAE industry. Retrieved from https://www.researchgate.net/publication/24077882_Significant_factors_causing_delay_in_the_UAE__industry
Frimpong, Y., Oluwoyeb, J., & Crawford, L. (2003). Causes of delay and cost overruns in of groundwater projects in a developing countries; Ghana as a case study. Retrieved from http://www.tamu.edu/faculty/choudhury/articles/45.pdf
Gido, J., & Clements, J. P. (2003). successful Project Management,. Soth Western Mason.
Global environment facility. (2012). Global environment facility ANNUAL PERFORMANCE REPORT 2012. Retrieved from http://www.thegef.org/sites/default/files/council-meeting-documents/GEF.ME_.C.44.Inf_.01_Annual_Performance_Report_2012_4.pdf
Hamilton, A. (2004). Handbook of project management procedures. Retrieved from http://www.icevirtuallibrary.com/doi/book/10.1680/hopmp.32583
Hanson, D. N. (2006). CAUSES OF CLIENT DISSATISFACTION IN THE SOUTH AFRICAN BUILDING INDUSTRY AND WAYS OF IMPROVEMENT: THE CONTRACTORS' PERSPECTIVES. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.1016.9317&rep=rep1&type=pdf
Harvard Business Review. (2015, March). Why senior managers wont collaborate, pp. 75-82.
Huang, X. (2011, March). An Analysis of the Selection of Project Contractor in the Management Process. Retrieved from http://www.ccsenet.org/journal/index.php/ijbm/article/viewFile/9709/6959
Juran, J. M., & Godfrey, A. B. (2010). Juran's quality handbook: The complete guide to performance excellence. New York: Mc Graw Hill.
Juravle, & Lewis. (2009). The role of championship in the mainstreaming of sustainable investment (SI) - What can we learn from SI pioneers in the United Kingdom? Organization & Environment. SAGE, 75-98.
Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in Supply Chain Projectsin Zambia. Retrieved from http://isiarticles.com/bundles/Article/pre/pdf/68267.pdf
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997, February). Factors influencing time and cost overruns on high-rise projects in Indonesia. Retrieved from https://www.researchgate.net/publication/24077230_Factors_influencing__time_and_cost_overruns_on_high-rise_projects_in_Indonesia
Katz, D., & Khan, R. L. (1966). The Social Psychology of Organizations. Retrieved from https://www.tamu.edu/faculty/bergman/katzkahn1978.pdf
Deloitte Annual Report. (2009). Deloitte Annual Report. Environmnetal factors in project implementation, p. 35.
Deloitte Annual Report. (2013). Progress and policies of Deloitte, p. 7.
Deloitte Annual Report. (2014). Deloitte Annual Report. Supply chain implementation constraints, p. 57.
Deloitte Annual Report. (2016). Deloitte Annual Report. Donor funded projects, p. 26.
Kenya Engineer. (2010). Kenya Engineer. Supply chains condition survey in Kenya, p. 13.
Kenya Engineer. (2012). Kenya Engineer. Status and Supply chains, p. 15.
Kerzner, H. (2009). Project Management. New Jersey: John Wiley & Sons.
Kirsch, I. (1999). Hypnosis and Placebos: Response Expectancy as a Mediator of suggestion effects. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.590.8550&rep=rep1&type=pdf
Kombo, D. K., & Tromp, D. L. (2006). Proposal and thesis writing. Makuyu: Paulines Publication Africa.
Koontz, H., & Weihrich, H. (2009). Essential of Management. Retrieved from https://books.google.co.ke/books?id=s_wzNWdevJoC&printsec=frontcover&dq=koontz+and+weihrich+2009&hl=en&sa=X&redir_esc=y#v=onepage&q=koontz%20and%20weihrich%202009&f=false
Lane, D. A., & Maxfield, R. (2004). Ontological Uncertainty and innovations. Retrieved from http://samoa.santafe.edu/media/workingpapers/04-06-014.pdf
Ling, F. Y. (2010, May 13). Key determinants of performance of design-bid-build projects in Singapore. Retrieved from http://www.tandfonline.com/doi/full/10.1080/096132103200048497?scroll=top&needAccess=true
Loosemore, M., & R, J. R. (2015). Valuing innovation in and infrastructure: Getting clients past a lowest price mentality. Emerald Group Publishing Limited.
Love, P. E., & Holt, G. D. (2000). business performance measurement: the SPM alternative. Retrieved from http://www.emeraldinsight.com/doi/abs/10.1108/14637150010352417
Magutu, P. O., Nyamwange, S. O., Mbeche, P. I., & Onsongo, C. O. (2013). An introduction to project management. Nairobi: Lelax Global Ltd.
Mansfield, N., Ugwu, O., & Daran, T. (1994, November 4). Causes of delay and cost overruns in Nigerian projects. Retrieved from http://www.sciencedirect.com/science/article/pii/0263786394900507
Marasini, R., & Dawood, N. (2006). Innovative managerial control system (IMCS): an application in precast concrete building products industry. Retrieved from http://www.emeraldinsight.com/doi/abs/10.1108/14714170610710640
Mavondo, F. T. (1999, August). Market Orientation: Scale Invariance and Relationship to Generic Strategies Across Two Countries. Retrieved from https://link.springer.com/article/10.1023/A:1009835515831
Maylor, H. (2003). Project Management. Retrieved from http://www.kvimis.co.in/sites/kvimis.co.in/files/ebook_attachments/Harvey%20Maylor%20Project%20Management,3rd_0.pdf
McShane, S. L., & Glinow, M. A. (2003). Organizational Behavior: Emerging Realities for the Workplace Revolution. New York: McGraw-Hill/.
Meyer, J. (2010, April 30). General Services Administration Streamlines the Procurement of Services. Retrieved from http://calhoun.nps.edu/bitstream/handle/10945/33498/NPS-AM-10-065.pdf?sequence=1&isAllowed=y
Mugenda, O. M., & Mugenda, A. G. (2003). Research Methods. Nairobi: ACTS PRESS.
Multilateral Investment Guarantee Agency. (2006). Multilateral Investment Guarantee Agency. Retrieved from https://www.miga.org/documents/06arenglish.pdf
Odeyinka, H., & Oladapo, A. A. (1997, January). The causes and effects of delays on completion cost of housing project in Nigeria. Retrieved from https://www.researchgate.net/publication/249643683_The_causes_and_effects_of__delays_on_completion_cost_of_housing_project_in_Nigeria
Ouchi, W. G. (1979, September 9). A Conceptual Framework for the Design of Organizational Control Mechanisms. Retrieved from https://business.illinois.edu/josephm/BA545_Fall%202011/S3/Ouchi%20(1979).pdf
Oya Icmeli Tukel, W. O. (1998). Analysis of the characteristics of projects in diverse industries. Retrieved from http://www.sciencedirect.com/science/article/pii/S0272696397000168
PARK, N., PETERSON, C., & SELIGMAN, M. E. (2004). STRENGTHS OF CHARACTER AND WELL-BEING. Retrieved from http://www.viacharacter.org/blog/wp-content/uploads/2013/12/Character-strengths-well-being-Park-Peterson-Seligman-2004.pdf
Peterson. (2004). Cultural Intelligence - A guide to working with people from other culture. Maine: Intercultural Press .
Reschke, H., & Schelle, H. (2012). Dimension of project management: fundamentals, techniques, organisation applications. Retrieved from https://books.google.co.ke/books?id=9F3yCAAAQBAJ&printsec=frontcover&dq=Reschke+and+Schelle+(2012)+Dimensions+of+Project+Management&hl=en&sa=X&redir_esc=y#v=onepage&q&f=false
ROGERS, E. M. (1995). DIFFUSION OF INNOVATIONS. Retrieved from https://www.d.umn.edu/~lrochfor/ireland/dif-of-in-ch06.pdf
Shahrzad Khosravi, H. A. (2011). A Success Measurement Model for Projects. Retrieved from http://www.ipedr.com/vol11/36-W00014.pdf
THE KENYA SUPPLY CHAINS ACT. (2007). THE KENYA SUPPLY CHAINS ACT. Retrieved from http://kenyalaw.org/lex/rest//db/kenyalex/Kenya/Legislation/English/Amendment%20Acts/No.%202%20of%202007.pdf
Tiwana, A. (2009, June). Governance-Knowledge Fit in Systems Development Projects. Retrieved from https://www.researchgate.net/publication/220079649_Governance-Knowledge_Fit_in_Systems_Development_Projects
Toor, S.-U.-R., & Ogunlaga, S. O. (2009). professionals' perception of critical success factors for large"scale projects. Retrieved from http://www.emeraldinsight.com/doi/abs/10.1108/14714170910950803
UNRWA. (2014). the harmonized results report 2014. Retrieved from https://www.unrwa.org/sites/default/files/harmonized_results_report_2014_0.pdf
Vandevoorde, I. S., & Vanhoucke, P. D. (2006, January 19). New Grounds:Time Dimension in Earned Value Management. Retrieved from http://www.earnedschedule.com/Docs/New%20Grounds%20PMB%202006%20Vandevoorde.pdf
Vanhoucke, M., & Vandevoorde. (2007-2008). Measuring the accuracy of earned value/earned schedule forecasting predictors. Retrieved from http://discovery.ucl.ac.uk/1506256/
Weil, D. N. (2013). Economic growth. Retrieved from https://books.google.co.ke/books?id=p79JDAAAQBAJ&pg=PR2&dq=weil+2013+economic+growth+international+edition&hl=en&sa=X&redir_esc=y#v=onepage&q=weil%202013%20economic%20growth%20international%20edition&f=false
Downloads
Published
How to Cite
Issue
Section
License
Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution (CC-BY) 4.0 License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.